Every public-works marvel on file, regardless of category. Sorted by ambition, not by alphabet.

All wondersFlyovers to nowhereBridges on noticeRoads reimaginedSkywalks to nowhereMetro in progressPublic toilets, theoretically
203Attractions catalogued
111Cities represented
4.1 ★Avg. visitor rating
23Documented fatal incidents

Ranked by Notoriety

Browse all 203 entries

Thiruvanmiyur–Uthandi ECR Elevated Corridor Suspension
Never Built
East Coast Road (ECR), between Thiruvanmiyur and Uthandi · Road

Thiruvanmiyur–Uthandi ECR Elevated Corridor Suspension

A planned four-lane elevated corridor along ECR between Thiruvanmiyur and Uthandi, awarded via a Hybrid Annuity Mode concession to KNR Mahabalipuram Infra Private Limited in February 2026, was put on hold pending review by a technical committee after being conspicuously omitted from Tamil Nadu's 2026-27 Highways policy note. A rival bidder had also filed a procurement challenge in the Madras High Court.

★ 3.9 · 1,368 reviewsEst. 2026
Maa Flyover — Decade-Long Delay, Cost Overrun and Chaotic Partial Opening
Completed after severe multi-year delay
9.2km corridor linking Science City/EM Bypass to Victoria Memorial/PG Hospital via AJC Bose Road · Flyover

Maa Flyover — Decade-Long Delay, Cost Overrun and Chaotic Partial Opening

Now West Bengal's longest flyover, it originally targeted an August 2012 deadline but was extended multiple times. It opened in October 2015 without its connecting ramps to the AJC Bose Road flyover finished, causing severe traffic chaos that forced police to temporarily shut it down; the eastbound and westbound connecting flanks were not completed until August 2016 and February 2019 respectively.

★ 4.6 · 1,367 reviewsEst. 2010
Avinashi Road Flyover Structural Neglect
Under Repeat Repair
Avinashi Road roundana, near Coimbatore Junction railway station · Flyover

Avinashi Road Flyover Structural Neglect

India's first roundabout-style grade separator and Tamil Nadu's second flyover has gone without adequate maintenance for decades; it has no pedestrian corridor, and tree roots/branches have weakened the structure. Plans to widen it have stalled amid official uncertainty.

★ 4.5 · 1,340 reviewsEst. 1974
Amritsar's Stalled Bypass-Road Flyovers
Under Repeat Repair
Ranjit Avenue bypass road, including Baba Bakala, Vallah and Loharka Road sites · Flyover

Amritsar's Stalled Bypass-Road Flyovers

Multiple flyovers on Amritsar's bypass road have remained incomplete years past deadline, turning the bypass into a routine accident zone due to poor visibility and narrow construction-zone passages; MP Gurjeet Singh Aujla called them "symbols of administrative neglect" in the Lok Sabha.

★ 3.8 · 1,339 reviewsEst. 2025
Walled City Drainage Collapse Forces Emergency Evacuation of 2,300-Year-Old Mummy
Under Repeat Repair
Walled City (Old City) area, including Albert Hall Museum basement · Other

Walled City Drainage Collapse Forces Emergency Evacuation of 2,300-Year-Old Mummy

Just 2-3 hours of heavy rain in August 2020 inundated Jaipur's Walled City, triggering landslides and forcing emergency rescue of a 2,300-year-old Egyptian mummy from the flooded basement of the Albert Hall Museum. The city's historic 18th-century drainage system had been dismantled over decades by encroachment, metro construction damage, and basement construction blocking water flow, while a 2016 JDA master drainage plan remained unfunded and unimplemented.

★ 4.2 · 1,339 reviewsEst. 2016
Stalled for 8 years — tender not yet issued
Railway overbridge connecting Ballabhgarh and Sohna highway · Bridge

Ballabhgarh–Sohna Railway Overbridge Widening — 8 Years Stalled

A four-laning project for this ROB, announced in 2016, has been stalled for eight years without construction beginning, due to unresolved land-acquisition disputes over ~360 yards of land held by multiple claimants and disagreements over compensation.

★ 4.1 · 1,333 reviewsEst. 2016
Sivananda Circle Flyover — Barricaded Days After Launch
Under Repeat Repair
Sivananda Circle, towards Race Course Road, Bengaluru · Flyover

Sivananda Circle Flyover — Barricaded Days After Launch

One of the replacement flyovers built after the original Basaveshwara-Hebbal "steel flyover" project was scrapped, this Sivananda Circle flyover was barricaded by BBMP within about a week of its launch after commuters complained of an uneven, undulating road surface. BBMP admitted the surface had problems and ordered a third-party firm to inspect and report on construction quality.

★ 3.5 · 1,327 reviewsEst. 2022
Pallav Junction Flyover — Years Behind Schedule
Under Repeat Repair
Pallav Junction, 132-foot Ring Road · Flyover

Pallav Junction Flyover — Years Behind Schedule

Approved in April 2021 with a March 2024 completion target, this ring-road flyover was still roughly 5% short of completion a year past deadline as of early 2025, with AMC having already issued the contractor two formal delay notices back in April 2023.

★ 3.5 · 1,309 reviewsEst. 2021
Chandwara Bridge Dilapidated Before Inauguration
Never opened (damaged before formal inauguration)
Chandwara · Bridge

Chandwara Bridge Dilapidated Before Inauguration

A newly built bridge at Chandwara was found with broken railings and visible structural damage even before it could be formally opened to traffic, raising questions about construction quality.

★ 4.4 · 1,305 reviewsNever opened (damaged before formal inauguration)
Bairamalguda flyover slab collapse
Collapsed
Bairamalguda, LB Nagar · Flyover

Bairamalguda flyover slab collapse

A slab of an under-construction flyover collapsed, injuring eight workers and passers-by.

★ 4.5 · 1,296 reviewsEst. 2023
Nehru Park underground parking & food court
Abandoned
Nehru Park · Other

Nehru Park underground parking & food court

An underground parking facility and "Food Villa" food court, once pitched as a modern parking solution and community hangout, now sit abandoned, with the food court itself demolished.

★ 3.9 · 1,292 reviewsAbandoned / demolished
Khalini–Talland Flyover — Stuck at Tendering Stage for Years
Never started construction — stuck in repeated tendering 4+ years
Khalini to Talland stretch, near BCS Chowk · Flyover

Khalini–Talland Flyover — Stuck at Tendering Stage for Years

A 220-metre flyover meant to ease chronic Khalini-Talland congestion has failed to move past tendering for years; CPWD has floated tenders four times, each cancelled or restarted after technical design revisions.

★ 4.6 · 1,291 reviewsEst. 2021
Grossly underutilised
Panaji city centre · Other

Panaji Multi-Level Car Parking Complex

This 465-space, three-floor-plus-terrace parking complex covering 14,611 sq m has run well below capacity since opening, filling to barely two-and-a-half floors even at peak times, despite parking being free; a planned hop-on hop-off shuttle service to draw users to the facility never materialised.

★ 4.5 · 1,284 reviewsEst. 2016
Ellis Bridge Rehabilitation Cost Overrun
Under Repeat Repair
Ellis Bridge, over the Sabarmati river, western Ahmedabad · Bridge

Ellis Bridge Rehabilitation Cost Overrun

Rehabilitation of Ahmedabad's historic Ellis Bridge began in September 2024 with a 12-month completion target, but had reached only 26% progress by the time authorities approved an extra ₹16 crore, pushing the budget from ₹26.88 crore to ₹42.90 crore. The same contractor's scope was later widened to also repair three other city bridges after a post-Gambhira-collapse safety review, reportedly because no separate tenders existed for that repair category.

★ 4.3 · 1,267 reviewsEst. 2024
Mumbai Coastal Road (Phase 1) — 6-Year Delay and ₹1,243-Crore Cost Overrun
Under Repeat Repair
10.58km stretch from Princess Street Flyover to the Bandra-Worli Sea Link, South Mumbai · Road

Mumbai Coastal Road (Phase 1) — 6-Year Delay and ₹1,243-Crore Cost Overrun

Mumbai's flagship coastal road, meant to be completed in 4 years from contract award, took over 6 years and multiple phased openings before full completion, with costs escalating by over ₹1,243 crore due to BMC-attributed delays including a mid-project change in pillar design. BMC penalised the contractor ₹14 crore for the delays even as it publicized claimed benefits like a "70% reduction in travel time."

★ 4.0 · 1,246 reviewsEst. 2018
Karnal Twin Flyover — Shelved Before Construction Began
Suspended indefinitely before construction started
Karnal city (single-pillar elevated flyover technology) · Flyover

Karnal Twin Flyover — Shelved Before Construction Began

A twin-flyover project using single-pillar technology, with its foundation stone laid in March 2024 and a 24-month plan, was suspended indefinitely after traders and residents protested during the Lok Sabha election period over fears of business impact, even though soil testing and structural designs were already complete.

★ 3.6 · 1,244 reviewsEst. 2024
Tambaram (Irumbuliyur) Flyover Cave-in and Cracks
Under Repeat Repair
Irumbuliyur Junction, GST Road, Mudichur, Tambaram · Flyover

Tambaram (Irumbuliyur) Flyover Cave-in and Cracks

In April 2025, a section of the road surface on the 2012-built Irumbuliyur/Tambaram flyover on GST Road caved in, and a crack was simultaneously found on the flyover's railing wall near its starting point. Just 13 years after construction, the structural deterioration alarmed residents and commuters, prompting police to barricade the area and divert traffic while emergency concrete repairs were carried out.

★ 3.7 · 1,240 reviewsEst. 2012
New Market (S.S. Hogg Market) Renovation Stalled
Abandoned
New Market / S.S. Hogg Market, Lindsay Street, central Kolkata · Other

New Market (S.S. Hogg Market) Renovation Stalled

Two years after the West Bengal government allocated ₹26 crore to renovate the 1874-built, Victorian-Gothic New Market — appointing Jadavpur University as consultant for central air-conditioning, seismic retrofitting, and repairs to its drainage, roof and toilets — no actual construction work had started on the deteriorating structure, which has cracked pillars and walls, flooding during rain, and roof leaks, despite housing 3,000 shops that generate ₹25 crore in annual revenue for KMC.

★ 4.7 · 1,227 reviewsEst. 2023
Pune Metro Pimpri–Dapodi corridor cost and time overrun
Under Repeat Repair
Pimpri to Dapodi metro corridor (with proposed Nigdi extension) · Metro station

Pune Metro Pimpri–Dapodi corridor cost and time overrun

Mahametro claimed the Pimpri-Dapodi route was "100% complete," but junction work at Dapodi, Morwadi, Sant Tukaramnagar and Kasarwadi stations remained unfinished, with the metro operating only up to Phugewadi; the Nigdi extension was further delayed pending Union Defence Ministry clearance over its alignment near the Dehu Road Ammunition Factory.

★ 4.0 · 1,223 reviewsEst. 2022
Saharsa bridge collapse
Collapsed
Saharsa district · Bridge

Saharsa bridge collapse

A three-span bridge collapsed when an overloaded tractor carrying maize crossed it, part of a wider pattern the state has seen (Bihar's collapsing bridges reportedly cost the state at least ₹3,953 crore collectively over 4 years).

★ 3.7 · 1,222 reviewsEst. 2025
Bandra Skywalk (East & West)
Abandoned
Bandra (E) & Bandra (W), near Bandra railway station · Skywalk

Bandra Skywalk (East & West)

Mumbai's first skywalk linked Bandra station to Kalanagar and was briefly used by over 100,000 pedestrians daily, but the Bandra East and West skywalks were later dismantled; 17 of 18 further planned MSRDC skywalks were cancelled.

★ 4.7 · 1,220 reviewsEst. 2008
Naya Raipur Skywalk
Abandoned
Naya Raipur capital complex area · Skywalk

Naya Raipur Skywalk

A skywalk built as a "modern urban amenity" in India's purpose-built new capital stands completed but essentially unused, towering over empty streets; local reporting describes it as a hangout for miscreants and a safety hazard for women, emblematic of the planned city's broader underuse.

★ 4.2 · 1,219 reviewsNever used / Abandoned
Thorayikkadavu Bridge Collapse
Collapsed
Thorayikkadavu, Koyilandy (Quilandy) · Bridge

Thorayikkadavu Bridge Collapse

A beam of an under-construction bridge at Thorayikkadavu in Koyilandy taluk collapsed on August 15, 2025, injuring two workers; local media framed it as public money wasted on shoddy construction.

★ 3.5 · 1,214 reviewsEst. 2025
Kollam NH-66 Embankment/Service-Road Collapse
Collapsed
Mylakkadu, Adichanallur panchayat, near Kottiyam (Mevaram–Kadampattukonam stretch of NH-66) · Road

Kollam NH-66 Embankment/Service-Road Collapse

On December 5, 2025, a sidewall embankment on an under-construction elevated NH-66 stretch collapsed during soil-filling work, opening craters that trapped vehicles including a school bus (all evacuated safely) — the second such embankment failure on this corridor within six months.

★ 4.8 · 1,213 reviewsEst. 2025
Abandoned
Proposed Technocity–Karamana corridor · Other

Thiruvananthapuram Monorail Project Scrapped

The state sanctioned a monorail in 2012, signed with DMRC in 2013, and ran two failed tender rounds before scrapping the plan in August 2014 for a "light metro" instead. As of the 2025-26 state budget, construction of any replacement had still not begun.

★ 3.5 · 1,188 reviewsEst. 2012
NH-365BG Underpass Bridge Slab Collapse
Collapsed
Somaram village, Wyra mandal, Khammam–Devarapalli Greenfield Expressway (NH-365BG) · Bridge

NH-365BG Underpass Bridge Slab Collapse

A freshly poured concrete slab of an under-construction underpass bridge caved in during evening hours after supporting scaffolding failed, injuring three workers.

★ 4.7 · 1,176 reviewsEst. 2024
Janampet Bridge — 12-Year Delayed Construction
Abandoned
Over the Kanugula stream, between Bunyadipur and Janampet villages, Srirangapuram mandal, Wanaparthy district · Bridge

Janampet Bridge — 12-Year Delayed Construction

A bridge meant to connect two villages across the Kanugula stream has stayed unfinished for over 12 years after quality-control problems, substandard work confirmed by 2018, design flaws, alleged fund misuse and contractor disputes repeatedly stalled the project. Officials admitted "there were no records of bills, measurement books, or other documents," and a stopgap ₹10-lakh temporary bridge's approach road has since suffered monsoon damage; villagers with 200 acres across the stream face a 12km detour instead of a direct 2km crossing.

★ 3.7 · 1,167 reviewsEst. 2009
Completed after 8-year delay, now operational
Kantatoli, near Pahari Mandir · Flyover

Kantatoli Flyover

The flyover's foundation was laid in November 2017 but stalled for years over design changes, alleged design flaws, and land acquisition; it was finally dedicated by CM Hemant Soren on October 4, 2024 — nearly eight years after starting, and only after a design overhaul to a precast segmental box girder system.

★ 4.7 · 1,166 reviewsEst. 2024
Chimanbhai Patel Bridge — Cracks and Bulging Slabs
Under Repeat Repair
Sabarmati river bridge near the Bullet Train station, leading toward RTO Circle · Bridge

Chimanbhai Patel Bridge — Cracks and Bulging Slabs

After heavy weekend rain in 2025, footpaths on this Sabarmati bridge split completely on the Sabarmati-side incline and fractured badly near the curve by the under-construction Bullet Train station, with concrete slabs visibly pushed outward at both spots. AMC had already flagged the need for repairs and expansion-joint replacement in a pre-monsoon inspection but postponed the fix, citing heavy daily traffic and ongoing secondary-wing construction.

★ 3.4 · 1,158 reviewsEst. 2025
Abandoned
Madugula, Anakapalli, Payakaraopeta, Pithapuram, Kaikaluru, Bhimavaram, Gannavaram, Penamaluru, Darsi, Satyavedu, Gudur, Pulivendula, Nandigama-Jaggayyapeta · Bridge

14 Stalled / Incomplete Bridges Across Nine Districts

A state disclosure revealed 14 bridges across 13 assembly constituencies in nine AP districts sat unfinished for years — 11 structurally complete but unusable because their approach roads were never built — taxpayer-funded "bridges to nowhere."

★ 4.6 · 1,155 reviewsEst. 2025
Indora–Dighori Elevated Corridor (flyover through residential balcony)
Under Construction
Ashok Nagar/Ashok Square, Nagpur · Flyover

Indora–Dighori Elevated Corridor (flyover through residential balcony)

A ~9km, ₹998-crore NHAI elevated corridor was built so close to a 150-year-old house that its beam passes roughly 14-15 feet through the family's balcony, triggering outrage over urban-planning failures. NHAI issued the family a 15-day eviction notice, calling the balcony an "unauthorised encroachment," despite an encroachment flag on the project having gone unaddressed for about a year.

★ 4.3 · 1,150 reviewsEst. 2025
Sion Road Over Bridge — Century-Old Bridge Demolished for Rail Expansion
Demolished / under reconstruction
Near Sion railway station, Mumbai · Bridge

Sion Road Over Bridge — Century-Old Bridge Demolished for Rail Expansion

This 112-year-old road-over-bridge near Sion station was closed to vehicular traffic from August 1, 2024 for demolition and reconstruction, after an IIT-Bombay structural audit recommended dismantling the century-old structure and rebuilding it with modern steel girders and RCC slabs. The bridge also obstructed Central Railway's proposed 5th and 6th line alignment between CSMT and Kurla, adding a second reason for its removal.

★ 3.6 · 1,148 reviewsEst. 1912
Never Built
City-wide – unauthorised colonies and JJ clusters · Public toilet

Swachh Bharat Mission toilets (unbuilt)

A CAG audit found Delhi's municipal corporations failed to construct a single toilet under the Swachh Bharat Mission despite ₹40+ crore sitting unused in bank accounts for over 30 months, while roughly 350,000 households lacked toilets.

★ 4.5 · 1,146 reviewsEst. 2016
Aguwani Ghat–Sultanganj bridge (Ganga bridge)
Collapsed
Over the Ganga river, between Sultanganj and Aguwani Ghat · Bridge

Aguwani Ghat–Sultanganj bridge (Ganga bridge)

A 1.8km under-construction cable-stayed bridge over the Ganga collapsed dramatically in April 2022, then again in June 2023 — a near-unprecedented double collapse during construction, without casualties either time.

★ 4.3 · 1,145 reviewsEst. 2015
Naroda Patiya–Galaxy Junction Flyover — Ahmedabad's Longest, Also Its Slowest
Under Repeat Repair
Naroda Patiya to Galaxy Junction · Flyover

Naroda Patiya–Galaxy Junction Flyover — Ahmedabad's Longest, Also Its Slowest

Billed as Ahmedabad's longest proposed flyover at 2.5km, this project was approved in August 2021 but construction did not actually start until July 2023 — nearly two years later. As of a March 2025 report it was only about 40% complete and already deemed "unlikely to meet its 36-month deadline."

★ 4.4 · 1,135 reviewsEst. 2021
Dumna Airport Terminal Canopy Collapse
Collapsed
Dumna Airport · Other

Dumna Airport Terminal Canopy Collapse

Part of the canopy at Jabalpur's newly built Dumna Airport terminal collapsed on June 27, 2024, during heavy rain — the first of three near-identical canopy collapses at recently built Indian airport terminals within three consecutive days (Jabalpur, then Delhi T1, then Rajkot).

★ 4.1 · 1,132 reviewsEst. 2024
Under-construction bridge girder collapse
Collapsed
Giridih district · Bridge

Under-construction bridge girder collapse

A girder of an under-construction bridge collapsed amid heavy rain in Giridih district, adding to a wider pattern of construction-quality failures in eastern India.

★ 3.8 · 1,124 reviewsCollapsed (under construction)
Tonk Road Sinkhole and Citywide Trench Hazards From Gas Pipeline Work
Under Repeat Repair
Tonk Road (near JMC headquarters), plus Sodala Road, Meera Marg (Mansarovar), JLN Marg (Birla Mandir area), Vidhyadhar Nagar, Vaishali Nagar, Jhotwara and Sikar Road · Road

Tonk Road Sinkhole and Citywide Trench Hazards From Gas Pipeline Work

A portion of Tonk Road collapsed into a roughly 20-foot-deep sinkhole in July 2026, one of several similar failures across the city caused by inadequately filled trenches dug for the Torrent Gas pipeline project. Rainfall repeatedly washed away the loose fill material used to close these trenches, exposing dangerous gaps and forcing repeated emergency repairs across multiple neighborhoods.

★ 4.1 · 1,124 reviewsEst. 2026
Under Repeat Repair
1.5km VIP corridor from Aligarh railway station to Aligarh Muslim University · Road

Aligarh's "Smart Road" Falls Apart Within Three Years

Aligarh's flagship Smart City "smart road" began falling apart within three years — streetlights broken or dark at night, and CCTV wiring/camera units near the Police Control Room and Lal Diggi crossing damaged.

★ 3.7 · 1,098 reviewsEst. 2022
Gaunchi Drain — "Waste to Wealth" Project Still Leaking Sewage
Still leaking / unresolved four years on
10km stormwater channel through Ballabhgarh, Parvatiya Colony, Sector 53, Sector 12, Sanjay Colony · Other

Gaunchi Drain — "Waste to Wealth" Project Still Leaking Sewage

A 10km stormwater drain launched in 2021 under the central "Waste to Wealth" mission was found four years later to still be leaking an estimated 1,002 million litres of contaminated water daily into the river, with the channel remaining choked.

★ 4.5 · 1,096 reviewsEst. 2021
Hyderabad Cycle Track Project (MMI Cycle Lanes) — Failed to Take Off
Grossly underused
Hitech City, NTR Gardens, Lumbini Park, Necklace Road, KBR Park, Banjara Hills, Jubilee Hills, Shamshabad, Gachibowli, Nehru Outer Ring Road, Ameerpet · Other

Hyderabad Cycle Track Project (MMI Cycle Lanes) — Failed to Take Off

A citywide network of dedicated cycle tracks built across major Hyderabad corridors has failed to gain adoption, with 15 cyclist accidents reported on the service-road cycle track in 2024 alone. Hyderabad's Bicycle Mayor said many tracks are blocked by vendors and parked vehicles, and sections suffer poor visibility, deterring especially parents from letting children use them.

★ 3.8 · 1,078 reviewsGrossly underused
Papagni Bridge Collapse
Collapsed
Papagni river crossing, connecting Kadapa and Anantapur districts · Bridge

Papagni Bridge Collapse

A bridge connecting Kadapa and Anantapur districts over the Papagni river collapsed in the early hours during severe November 2021 floods, cutting off a key inter-district road link.

★ 4.0 · 1,047 reviewsEst. 2021
Smart City Road Repeatedly Caves In Near Bareilly College
Under Repeat Repair
Near Bareilly College · Road

Smart City Road Repeatedly Caves In Near Bareilly College

A road built under Bareilly's Smart City project caved in near Bareilly College, creating a large pothole — the second collapse recorded at this exact location, exposing weak sewer infrastructure beneath the surface work.

★ 4.5 · 1,031 reviewsEst. 2026
Ashoka Rajpath Double-Decker Flyover Cracks
Under Repeat Repair
Ashoka Rajpath (three-level corridor near PMCH, 1.45km lower + 2.2km upper deck) · Flyover

Ashoka Rajpath Double-Decker Flyover Cracks

Bihar CM Nitish Kumar inaugurated this three-level flyover on June 11, 2025, calling it "not just a bridge, but a vision." By August 2025 visible cracks had appeared following heavy monsoon rainfall, sparking public criticism about construction quality.

★ 4.3 · 1,025 reviewsEst. 2025
Ludhiana Southern Bypass — 7 Years Late and Over Budget
Completed but 7 years late and over budget
Doraha to Ludhiana-Ferozepur Road, along Sirhind-Sidhwan Canal · Road

Ludhiana Southern Bypass — 7 Years Late and Over Budget

The four-laning of the Ludhiana Southern Bypass was tendered in 2010 with a two-year deadline but wasn't completed until 2019 after officials failed to complete inter-department formalities before the tender was allotted; poor PWD-Irrigation Department coordination drove repeated design changes.

★ 3.5 · 1,012 reviewsEst. 2010
Shahpura Railway Overbridge (NH-45)
Collapsed
Shahpura-Bhitauni section, Jabalpur-Bhopal NH-45, ~40km from Jabalpur · Bridge

Shahpura Railway Overbridge (NH-45)

A retaining-wall section of this overbridge collapsed on December 18, 2025, and a second section collapsed again on February 22, 2026 — barely 3-4 years after completion — forcing traffic closure on the busy Jabalpur-Bhopal highway.

★ 4.1 · 1,005 reviewsEst. 2018
Dravyavati River Rejuvenation Project — Missed Deadlines and Court Contempt
Under Repeat Repair
Dravyavati River corridor through Jaipur, including Ambawadi and the stretch from Shastri Nagar to Vidyadhar Nagar · Other

Dravyavati River Rejuvenation Project — Missed Deadlines and Court Contempt

A flagship ₹1,676-crore project to rejuvenate Jaipur's Dravyavati river (formerly the sewage-choked Amanishah Nallah) missed its October 2018 completion deadline, left tributaries like Kartarpura Nulla untouched (causing dangerous sinkholes during rain, now under High Court litigation), and continues receiving untreated sewage from the Walled City, Sanganer and Pratap Nagar. In 2026 the Rajasthan High Court found the JDA had ignored a NEERI report's recommendations for constructing cement concrete drain channels along the river and demanded an explanation for the continued delay.

★ 4.6 · 994 reviewsEst. 2018
Peenya flyover
Under Repeat Repair
Tumkur Road, Peenya industrial area · Flyover

Peenya flyover

Heavy vehicles were banned from the flyover for over 3 years after structural defects emerged; a political party alleged corruption behind the substandard construction.

★ 3.8 · 990 reviewsEst. 2000
Balharshah Junction foot overbridge collapse
Collapsed
Balharshah railway junction · Bridge

Balharshah Junction foot overbridge collapse

A portion of a foot overbridge at Balharshah railway junction, roughly 60 feet high, gave way in the evening, sending commuters falling onto the tracks below and injuring 13 people.

★ 3.6 · 969 reviewsEst. 2022
Kotdwar Bridge Collapse Amid Heavy Monsoon
Collapsed
Kotdwar (exact bridge/river not specified) · Bridge

Kotdwar Bridge Collapse Amid Heavy Monsoon

A bridge in Kotdwar collapsed on July 13, 2023 amid heavy monsoon rains, an incident significant enough to coincide with a statewide school closure in Uttarakhand over weather/infrastructure safety concerns.

★ 4.2 · 963 reviewsEst. 2023
Nanda Ki Chowki Bridge — Approach Road Collapse
Collapsed
Near Premnagar / Nanda Ki Chowki, National Highway · Bridge

Nanda Ki Chowki Bridge — Approach Road Collapse

The approach road of a newly inaugurated ₹16-crore bridge on the Dehradun-Paonta Sahib highway near Premnagar/Nanda Ki Chowki caved in during heavy rain just 16-17 days after its opening, though it was patched and reopened within about 12 hours. Note: this is the one collapse confirmed across available reporting — claims of the same bridge collapsing three times in a year could not be independently verified via credible sources as of this research; only this single, well-documented incident is included here.

★ 4.9 · 958 reviewsEst. 2026
Vishnupuri flyover collapse (Nanded–Latur highway)
Collapsed
Near Shri Guru Gobind Singhji Institute of Engineering and Technology, Vishnupuri, Nanded outskirts · Flyover

Vishnupuri flyover collapse (Nanded–Latur highway)

A portion of the lower flyover structure — reportedly built with "murum" (loose soil/gravel) fill rather than proper engineered material — caved in on the morning of July 9, 2026, injuring two people on a two-wheeler. Both the service road and upper bridge were shut, and residents demanded a formal inquiry and action against those responsible.

★ 4.8 · 951 reviewsEst. 2026
Palwal Elevated Flyover — Abandoned Mid-Construction Over Payment Dispute
Abandoned
National Highway through Palwal city (Delhi-Mathura-Agra route) · Flyover

Palwal Elevated Flyover — Abandoned Mid-Construction Over Payment Dispute

Construction of a 2.5km elevated flyover began in August 2017 but halted in October 2019 when the contracting agency walked off mid-project amid a payment dispute with the main concessionaire; work remained suspended for at least nine months despite an NHAI notice.

★ 4.7 · 949 reviewsEst. 2017
Operational but chronically underused, running at a loss
North-South corridor, Charbagh to Munshi Pulia/Amausi Airport (21 stations) · Metro station

Lucknow Metro — Showpiece Line Running at a Loss

The only operational corridor of a system sanctioned at ₹6,928 crore sees only a fraction of expected ridership — at Hussainganj station roughly 600 people board/alight daily, and about half the seats run empty between Charbagh and the airport.

★ 4.8 · 928 reviewsEst. 2017
Bhavnagar–Somnath Highway Bridge Collapse (near Rajula)
Under Repeat Repair
Near Rajula, on the Bhavnagar–Somnath highway · Bridge

Bhavnagar–Somnath Highway Bridge Collapse (near Rajula)

A portion of an under-construction bridge on the Bhavnagar-Somnath national highway collapsed near Rajula; a follow-up report roughly three years later found fresh cracks on the same stretch, worrying residents and motorists about a repeat failure.

★ 4.1 · 924 reviewsEst. 2023
GHMC Public Toilets — Crores Spent on Toilets That "Don't Exist"
Non-functional / never opened (many units)
City-wide across Greater Hyderabad Municipal Corporation limits · Public toilet

GHMC Public Toilets — Crores Spent on Toilets That "Don't Exist"

GHMC has spent crores maintaining public toilets that turned out to be non-functional or non-existent — of a claimed 2,260 to 5,299 toilet seats, only around 400 were actually functional. In 2021 GHMC installed 2,260 temporary toilets that were reportedly "not opened for public use and were used for erecting banners," with many lacking water and sewerage connections.

★ 3.7 · 921 reviewsEst. 2014
Mira Road–Bhayandar Flyover — 4 Lanes Suddenly Shrink to 2
Still Standing (Barely)
Flyover connecting Mira Road to Bhayandar (along the metro viaduct corridor) · Flyover

Mira Road–Bhayandar Flyover — 4 Lanes Suddenly Shrink to 2

A newly built flyover carrying four lanes abruptly narrows to just two lanes midway across its span, forcing high-speed traffic into a sudden bottleneck; a viral video sparked public debate over the design, with critics calling it a road-safety hazard. MMRDA denied it was a flaw, saying the transition reflects "available road width constraints, and future network planning," with two lanes reserved for Bhayander East and future expansion.

★ 3.5 · 918 reviewsEst. 2026
Tellapur Underpass — Chronic Flooding
Under Repeat Repair
Tellapur, Serilingampally Zone, Cyberabad Municipal Corporation limits · Road

Tellapur Underpass — Chronic Flooding

The Tellapur underpass becomes severely waterlogged after every heavy rainfall due to the absence of an effective drainage system with no proper outlet for rainwater, causing traffic standstills lasting hours. Vehicles become stranded and the State Disaster Response Force has had to be deployed to pump water and manage congestion.

★ 4.7 · 910 reviewsEst. 2025
Pardi Flyover
Under Repeat Repair
Pardi, Eastern Nagpur · Flyover

Pardi Flyover

A partially built span of this flyover collapsed during construction in October 2021; then, within a day of its official inauguration in February 2025, a chunk of concrete fell and damaged a passing car; by August 2025 wide gaps had opened between deck segments. The contractor (GDCL) claimed the fallen material was construction "waste," not part of the structure.

★ 4.6 · 902 reviewsEst. 2020
Still Standing (Barely)
Manair river, Lower Manair Dam riverfront · Bridge

Karimnagar Cable-Stayed Bridge (Manair Riverfront)

Built as a tourism showpiece with a dynamic LED lighting system, the bridge's lights stopped working within about 18 months, its pavement deteriorated, and an unpaid electricity bill of over ₹3 crore piled up; locals say it has become a late-night drinking spot rather than a tourist draw.

★ 3.7 · 900 reviewsEst. 2023
Parimal Underpass — Cracked Walls and Recurring Flooding
Under Repeat Repair
Parimal Underpass, Paldi, near Parimal Garden · Road

Parimal Underpass — Cracked Walls and Recurring Flooding

An August 2024 AMC bridge-audit inspection found cracks in the walls of this heavily used underpass, one of dozens of structures citywide flagged as defective. Weeks later, after about 3.5 inches of rain fell in 24 hours, the underpass flooded and trapped a 25-passenger inter-city bus overnight, requiring rescuers to pull passengers out through the windows using ropes.

★ 4.1 · 895 reviewsEst. 2024
1960s Bridge Over Gurgaon Canal Collapses Under Truck Traffic
Collapsed
Ballabgarh, connecting Sector 25 and Sector 55 · Bridge

1960s Bridge Over Gurgaon Canal Collapses Under Truck Traffic

A decades-old, poorly maintained bridge over the Gurgaon canal in Ballabgarh collapsed into a V-shape on a Friday evening while heavy trucks were crossing, trapping several vehicles in the water; no fatalities reported.

★ 3.6 · 885 reviewsEst. 1960
Srinagar Smart City Drainage Failure
Still failing after ₹792 crore spent — external audit ordered
Old City Boulevard Road, Dalgate, Khanyar, Sada Kadal, Nalamar, Rajbagh, Bohri Kadal, Jawahar Nagar, Bemina, Residency Road · Road

Srinagar Smart City Drainage Failure

Despite ₹792 crore spent under the Smart City project, major roads, hospitals and residential areas continue to flood after just hours of rain, most recently in July 2026 when dozens of neighbourhoods were submerged; SMC identified ~60 waterlogging hotspots citywide.

★ 4.6 · 875 reviewsEst. 2017
Abandoned
Panchavati and Bhadrakali (old city areas) · Road

Smart City Area-Based Development roads (57 roads cancelled)

Of 197 roads (43km) planned for modernisation — with footpaths, utility conduits, stormwater lines and smart bus stops — under Nashik's Smart City Area-Based Development plan, 57 roads covering 11km were formally cancelled by the Nashik Municipal Smart City Development Corporation board after facing repeated delays.

★ 3.4 · 873 reviewsEst. 2020
Silk Board–Ragigudda double-decker flyover
Under Repeat Repair
Silk Board Junction, HSR Layout · Flyover

Silk Board–Ragigudda double-decker flyover

Bengaluru's first double-decker flyover was shut for urgent safety fixes just days after it was opened to traffic.

★ 3.7 · 867 reviewsEst. 2026
Mirza Ismail (MI) Road 12-Foot Crater After Monsoon Rain
Collapsed
Mirza Ismail (MI) Road, one of Jaipur's busiest commercial thoroughfares · Road

Mirza Ismail (MI) Road 12-Foot Crater After Monsoon Rain

A massive, roughly 12-foot-deep crater suddenly opened up on MI Road, one of the city's busiest streets, after continuous heavy rains, forcing emergency barricading and repair. It was widely shared on video as an example of the poor state of Jaipur's road infrastructure under monsoon stress.

★ 4.8 · 843 reviewsEst. 2025
Still Standing (Barely)
Sector 17 · Other

Sector 17 multi-level parking complex

A ₹48-crore multi-level parking complex sits largely empty years after opening, while nearby surface lots remain jam-packed; its floors are instead used to park municipal waste vehicles, bicycle-share cycles and a private vendor's taxis.

★ 3.6 · 811 reviewsEst. 2016
Under Construction
Chandpole–Badi Chaupar corridor (Phase 1B/1C); Ambabari–Sitapura corridor (Phase 2, Orange Line) · Metro station

Jaipur Metro's Chronic Multi-Phase Delays

The Walled City extension (Phase 1B) opened years late in September 2020. Its further extension (Phase 1C) began underground construction only in 2024 and remains unfinished. Phase 2, first proposed for 2021 completion, only got its first civil contract awarded in January 2026 — pushing real completion to around 2028-2031.

★ 4.3 · 808 reviewsEst. 2020
Collapsed
BCT Road, KM 35.50, Chariduar police station area, near Bhalukpong · Road

BCT Road RCC Culvert Failure

An RCC culvert on the BCT Road failed under continuous heavy rainfall in August 2026, causing road inundation and forcing the District Magistrate to shut the stretch to all but emergency vehicles under the Disaster Management Act.

★ 4.8 · 808 reviewsEst. 2026
Mehdipatnam Skywalk — Five Years and Still Incomplete
Under Repeat Repair
Mehdipatnam Rythu Bazar bus stop junction, Mehdipatnam · Skywalk

Mehdipatnam Skywalk — Five Years and Still Incomplete

A 390-metre pedestrian skywalk with 13 elevators and five entry/exit points meant to serve roughly 50,000 daily pedestrians has remained under construction for over five years, with an HMDA officer's June 2024 promise of "completion by the end of the month" still unmet as of April 2026. Citizens have separately criticised its design for low clearance forcing pedestrians to crouch, poorly placed pillars, and traffic-jam-inducing barrier blocks near the busy junction.

★ 4.7 · 806 reviewsEst. 2021
Damodar Iron Bridge and Water Pipeline Collapse
Collapsed
Mohishila Colony/Damodar riverbed, near Asansol South, Raniganj and Jamuria · Bridge

Damodar Iron Bridge and Water Pipeline Collapse

A 40-year-old iron bridge carrying a drinking-water pipeline collapsed into the Damodar river on July 23, 2025, cutting off water supply to Mohishila Colony, Searsole, Benali and parts of Asansol, Raniganj and Jamuria, requiring emergency tanker deployment.

★ 3.4 · 792 reviewsEst. 1985
Bowbazar East-West Metro Land Subsidence
Under Repeat Repair
Bowbazar — Durga Pituri Lane and Madan Dutta Lane, central Kolkata · Metro station

Bowbazar East-West Metro Land Subsidence

On August 31, 2019, a tunnel-boring machine building the East-West Metro corridor struck an aquifer beneath Bowbazar's soft, historically wetland soil, causing numerous two-century-old buildings on Durga Pituri Lane to crack and partially collapse; 23 houses were demolished. The crisis recurred in May 2022 (3 more houses razed) and October 2022 (10 buildings cracked, 136 more residents evacuated), with a Jadavpur University expert panel subsequently recommending 45 additional houses be razed.

★ 4.2 · 792 reviewsEst. 2019
Jhansi Road Cave-In
Under Repeat Repair
Jhansi Road, near Jhansi Bus Stand · Road

Jhansi Road Cave-In

A section of Gwalior's busy Jhansi Road — where construction had already dragged on for about 1.5 years without finishing — caved into a 10-foot-deep crater after roughly two hours of heavy rain, trapping a passing car whose occupants escaped unhurt.

★ 4.0 · 790 reviewsEst. 2026
Jaipur Ring Road — A Quarter-Century of Delays and Stalled Control
Under Repeat Repair
Ring road corridor circling Jaipur (Agra Road-Ajmer Road via C-Zone Bypass; Northern Ring Road Chhitroli-Bassi) · Road

Jaipur Ring Road — A Quarter-Century of Delays and Stalled Control

First conceived in 2000, actual construction on Jaipur's Ring Road only began in 2011, and the original contractor's deal was terminated in 2016 for lack of progress; a new contractor finished only a partial 27km stretch by 2019, still missing toll infrastructure, cloverleaves, electricity and traffic signals years later. A newly announced Northern Ring Road (100km, ₹3,000 crore) remains stuck at the land-acquisition stage across 150+ villages as of 2025, with the JDA now formally seeking to strip NHAI of control over the project, citing its slow progress.

★ 3.6 · 789 reviewsEst. 2000
Abandoned
Doraha, on the Southern Bypass route along Sirhind-Sidhwan Canal · Bridge

Doraha Bridge Over Sirhind Canal — Abandoned Mid-Construction

A bridge over the Sirhind Canal at Doraha, part of the Ludhiana Southern Bypass project, was left incomplete when work stopped in July 2013; construction materials remain abandoned on-site years later.

★ 4.2 · 783 reviewsEst. 2013
Tala Bridge
Under Repeat Repair
Tala, B.T. Road, North Kolkata · Bridge

Tala Bridge

One of Kolkata's oldest bridges was closed first to heavy vehicles and eventually to most traffic for years after being declared structurally weak, echoing the Majerhat collapse.

★ 4.2 · 782 reviewsEst. 1940
Smart City Mission Bhopal — "No Visible Development"
Under Repeat Repair
City-wide (multiple area-based development sites) · Other

Smart City Mission Bhopal — "No Visible Development"

Nearly a decade after Bhopal was selected under India's Smart City Mission, residents, local leaders and journalists report little to no visible development on the ground, prompting demands for a high-level probe.

★ 4.6 · 770 reviewsEst. 2016
Hosur Flyover Structural Shift and Crack
Under Repeat Repair
Bagalur Road Circle, Hosur Corporation limits, Krishnagiri district · Flyover

Hosur Flyover Structural Shift and Crack

A flyover on the Chennai-Bengaluru National Highway at Hosur developed a roughly 15cm-wide, 50-metre-long gap after shifting laterally by about half a foot, forcing complete closure and diverting traffic onto service roads for up to 3km of congestion during emergency stabilisation.

★ 3.5 · 744 reviewsEst. 2025
Vemulawada Under-Construction Bridge Collapse (Mulwagu)
Collapsed
Mulwagu/Mulavagu tank, Vemulawada, Rajanna Sircilla district · Bridge

Vemulawada Under-Construction Bridge Collapse (Mulwagu)

One of two arch-technology bridges being built on the Mulwagu tank since 2016 developed severe cracks and partially collapsed after 13cm of rainfall increased water flow, loosening the centering and sweeping away supporting iron rods over a 38-metre stretch. Residents disputed the official weather-only explanation, alleging construction delays and poor material quality were the real cause.

★ 3.9 · 739 reviewsEst. 2016
Kali River Bridge Collapse
Collapsed
Kodidag area, NH-66 near the Karnataka–Goa border · Bridge

Kali River Bridge Collapse

Three portions of the roughly 40-year-old Kali River bridge on the Karnataka–Goa national highway collapsed simultaneously around 1am on August 7, 2024, sending a loaded lorry into the river and disrupting a key interstate route.

★ 3.6 · 734 reviewsEst. 1980
Citywide Bridge Bearing Failures — Gandhi, Sardar and Majmudar Bridges
Under Repeat Repair
Gandhi Bridge, Sardar Bridge and Parikshitlal Majmudar Bridge, all over the Sabarmati river · Bridge

Citywide Bridge Bearing Failures — Gandhi, Sardar and Majmudar Bridges

A safety review ordered after the July 2025 Gambhira Bridge collapse found deteriorated elastomeric bearings across 89 spans of three key Ahmedabad river bridges — 38 spans on Gandhi Bridge, 48 on Sardar Bridge and 3 on Parikshitlal Majmudar Bridge — prompting a ₹21.55 crore emergency repair sanction. The review followed an August 2024 AMC audit that had already found 75% of 70 inspected bridges/flyovers citywide defective.

★ 4.4 · 723 reviewsEst. 2025
Tiruvannamalai State Highway Bridge Collapse
Collapsed
State Highway bridge over the Thenpennai (Pennar) river, between Agarampallipattu and Thondamannur · Bridge

Tiruvannamalai State Highway Bridge Collapse

A newly built bridge across the Thenpennai river collapsed on December 3, 2024, during Cyclone Fengal — just three months after opening. The bridge sat at a river bend acknowledged in its own tender document, and nearby bridges survived the same flood undamaged. Anti-corruption group Arappor Iyakkam noted that six months on, no FIR or accountability action had been taken.

★ 3.8 · 719 reviewsEst. 2024
Recurring monsoon waterlogging of underpasses
Under Repeat Repair
City-wide – Hero Honda Chowk, Rajiv Chowk, IFFCO Chowk and other underpasses · Road

Recurring monsoon waterlogging of underpasses

Despite over a decade of drainage and flood-mitigation spending, Gurugram's underpasses and major roads flood every monsoon, submerging vehicles and paralysing traffic citywide.

★ 3.6 · 715 reviewsUnder repeat repair (recurring failure)
NH-66 Kooriyad Embankment and Retaining Wall Collapse
Rebuilt
Kooriyad, National Highway 66 · Road

NH-66 Kooriyad Embankment and Retaining Wall Collapse

A section of NH-66 under construction at Kooriyad collapsed on May 19, 2025 when the foundation soil failed under a high embankment load; the retaining wall collapsed again days later. NHAI suspended its project director, terminated the site engineer, debarred contractor KNR Constructions for up to a year, and fined it ₹20 lakh.

★ 4.4 · 714 reviewsEst. 2025
Collapsed
Hirasar, Rajkot International Airport — passenger pick-up area · Other

Hirasar Airport (Rajkot International Airport) Canopy Collapse

On June 29, 2024, a canopy at the passenger pick-up area of Rajkot's newly built Hirasar airport collapsed during heavy monsoon rain while maintenance crews cleared accumulated water — the third such canopy collapse at a new Indian airport terminal in as many days.

★ 4.8 · 713 reviewsEst. 2023
Bopal-Ghuma-Shilaj Railway Overbridge Ends at a Private Plot Wall
Never opened (structure complete but unusable)
Spans the Gora rail yard; north ramp opens onto Bopal-Ghuma road, south ramp terminates near Manipur-Shilaj area · Bridge

Bopal-Ghuma-Shilaj Railway Overbridge Ends at a Private Plot Wall

After six years and ₹65 crore of construction shared between AUDA, DFCCIL and Railways, this railway overbridge connecting Bopal-Ghuma to Shilaj was structurally completed — but its southern ramp simply terminates in a dead end, blocked by a private property's boundary wall, with only a narrow six-metre dirt track leading roughly 2km to the Shilaj main road. Video of the bridge literally running into a wall went viral, becoming a symbol of poor inter-agency planning. As of January 2025 the connecting road on the far side remained unconstructed.

★ 3.7 · 713 reviewsEst. 2018
Garuda Varadhi (Srinivasa Sethu) Flyover
Under Repeat Repair
Tanapalli NH junction to Kapiletheertham/Nandi Circle, Tirupati city · Flyover

Garuda Varadhi (Srinivasa Sethu) Flyover

A flagship flyover jointly funded by the TTD temple trust and municipal corporation blew past its 2-year deadline after TTD's temple-donation income collapsed during COVID-19, starving the project of funds for extended stretches while partially built pillars sat idle.

★ 3.5 · 710 reviewsEst. 2018
Hindon Elevated Road — Pillar Erosion & Murky Maintenance Takeover
Still Standing (Barely)
10.3km corridor from UP Gate/NH-9 through Ghaziabad · Road

Hindon Elevated Road — Pillar Erosion & Murky Maintenance Takeover

India's longest six-lane elevated road at the time it opened saw soil erode around pillar No. 187 within months of opening. In 2022 the municipal corporation abruptly took over maintenance and advertising rights without prior board approval, raising concerns about hidden costs.

★ 4.0 · 709 reviewsEst. 2018
Bengaluru Steel Flyover project
Never Built
Proposed route: Basaveshwara Circle to Hebbal / airport road · Flyover

Bengaluru Steel Flyover project

Karnataka government's ambitious 6.7km elevated steel flyover to the airport was cancelled after sustained public protests over tree-felling, cost, and design.

★ 4.7 · 707 reviewsEst. 2016
Under Repeat Repair
Madan Mahal · Flyover

Madan Mahal Flyover

About eight months after inauguration, chunks of concrete began falling from the Madan Mahal section of this flyover, captured on video and widely shared; residents say they are now afraid to use the underpass beneath it after earlier reports of joint gaps and cracks.

★ 4.9 · 694 reviewsEst. 2025
IFFCO Chowk flyover crack
Under Repeat Repair
IFFCO Chowk · Flyover

IFFCO Chowk flyover crack

A 40-foot-long crack appeared in the flyover's structure, prompting emergency inspection and repair work on one of Gurugram's busiest junctions.

★ 4.1 · 688 reviewsEst. 2007
Tumakuru Road (Dr Shivakumara Swamiji) Flyover — Fraying Cables Closure
Under Repeat Repair
Dr Shivakumara Swamiji Flyover, Tumakuru Road, connecting Goraguntepalya to Nelamangala, North Bengaluru · Flyover

Tumakuru Road (Dr Shivakumara Swamiji) Flyover — Fraying Cables Closure

NHAI abruptly shut this elevated flyover on National Highway 4 for about a week from December 25, 2021 after a routine post-monsoon inspection found rust/erosion damage to two of the 20 steel cables linking pillars 102 and 103. The sudden closure caused major traffic congestion on the highway while an expert committee assessed whether the cables needed replacement.

★ 3.8 · 681 reviewsEst. 2021
Still Standing (Barely)
Pimple Nilakh, on the Aundh–Ravet BRTS corridor · Flyover

Rakshak Chowk Flyover

Within 24 hours of opening, this flyover saw two accidents and drew criticism over its steep gradient flagged in early safety audits; commuters have since publicly said the road below is "wider, feels safer and experiences less congestion" than the flyover meant to relieve traffic.

★ 3.6 · 679 reviewsEst. 2026
Dharamshala Smart City Drainage Failure
Under Repeat Repair
Smart Road (School Board to Bus Stand), Churan, Barol, Sudher, McLeodganj · Road

Dharamshala Smart City Drainage Failure

Despite hundreds of crores spent rebuilding roads/drains under the Smart City Mission, Dharamshala's new covered drainage is too narrow, incorrectly sloped and cable-obstructed, causing uncontrolled rainwater flow every monsoon, replacing older open drains that handled both drainage and irrigation.

★ 4.5 · 678 reviewsEst. 2016
NH-327E Mechi River Bridge Collapse
Collapsed
Gorichak, between Galgaliya and Araria, over the Mechi River · Bridge

NH-327E Mechi River Bridge Collapse

A 100-metre span of an under-construction bridge collapsed into the Mechi River on June 4, 2023, despite no significant rise in river water levels — the 11th bridge collapse recorded in Bihar within three years, prompting an expert probe.

★ 3.6 · 673 reviewsEst. 2023
Gaganpahad Underpass — Flooding From a Breached Retaining Wall
Still Standing (Barely)
Gaganpahad · Road

Gaganpahad Underpass — Flooding From a Breached Retaining Wall

The underpass floods with knee-deep water during rains because of a breached retaining wall between a nearby lake and an industrial area, with no proper drainage outlet. Despite multiple resident complaints, only cosmetic civic work (painting) has been done — the structural breach itself remains unrepaired.

★ 3.4 · 660 reviewsEst. 2025
Puducherry Harbour-Induced Beach Erosion
Under Repeat Repair
Puducherry town beachfront and Puducherry Port/harbour area · Other

Puducherry Harbour-Induced Beach Erosion

Construction of Puducherry's port/harbour in the late 1980s blocked the natural northward sand flow, and within a decade the town's entire beach had been swallowed by the sea, devastating over a dozen fishing villages and displacing roughly 7,000 fishing families. Subsequent breakwaters and a seawall shifted erosion elsewhere and cut off village sea access; restoration only began in 2017 after sustained activist pressure.

★ 4.4 · 645 reviewsEst. 1980
Still Standing (Barely)
Indira Gandhi Flyover over Pune–Lonavala railway line (connects old Pune-Mumbai highway to Pimpri village); Chinchwad Station Flyover, Chinchwad · Flyover

Indira Gandhi Flyover & Chinchwad Station Flyover (declared unsafe)

The Central Railway formally wrote to PCMC demanding demolition of these two of the city's oldest flyovers, stating their structural "life expectancy has expired" and that they remain unsafe despite PCMC spending three years on reinforcement work on the Indira Gandhi flyover.

★ 4.8 · 642 reviewsEst. 1977
Abandoned
Proposed Malaparamba–Civil Station / city-wide corridor · Metro station

Kozhikode Metro/Monorail Repeatedly Scrapped and Redesigned

Kozhikode's transit plans flip-flopped for 15+ years — full metro (2008) to monorail (2012, scrapped 2014 after the sole bidder nearly doubled the cost) to "light metro" (foundation stone laid 2016) to a fresh switch back to full metro announced in the 2025-26 budget — with no line ever built.

★ 4.8 · 641 reviewsEst. 2008
Palarivattom flyover ("Palarivattom flyover scam")
Rebuilt
Palarivattom, NH-66 bypass / Pipeline Junction · Flyover

Palarivattom flyover ("Palarivattom flyover scam")

Just three years after opening, structural cracks and weak concrete forced authorities to demolish and rebuild the flyover; IIT-Madras and "Metro Man" E. Sreedharan's review found the contractor had used substandard construction materials, sparking a major corruption case.

★ 3.6 · 634 reviewsEst. 2014
Civil Lines Flyover Stuck at 50-60% Completion for Five Years
Under Repeat Repair
Civil Lines Gate to BJP Chauraha, connecting Ajmer Road, Tonk Road, C-Scheme and M.I. Road · Flyover

Civil Lines Flyover Stuck at 50-60% Completion for Five Years

A flyover meant to relieve chronic congestion in Jaipur's C-Scheme commercial area remains only half-built five years after work began, with completion unlikely even by 2026. The Jaipur Development Authority (JDA) imposed a ₹1.07 crore penalty on the contractor for slow progress, but work reportedly slowed further rather than accelerating afterward.

★ 4.2 · 612 reviewsEst. 2021
Mangaluru Town Hall Skywalk (shelved)
Never Built
Near Town Hall / Maidan Road · Skywalk

Mangaluru Town Hall Skywalk (shelved)

A pedestrian skywalk was proposed and its foundation laid near Town Hall to address a pedestrian-accident hotspot, but the project languished for roughly three years before being quietly shelved in favour of a ₹6 crore underpass instead.

★ 4.0 · 602 reviewsEst. 2016
Butterfly Bridge (Thergaon–Chinchwad)
Under Repeat Repair
Over the Pawana river, connecting Thergaon and Chinchwad · Bridge

Butterfly Bridge (Thergaon–Chinchwad)

Meant to ease heavy-vehicle traffic between Thergaon and Chinchwad, this 107m bridge remained incomplete on one side eight years after work began, missing multiple deadlines including a final January 2025 target. PCMC's Joint City Engineer attributed the delay to objections from a housing society that forced design and height changes.

★ 4.1 · 599 reviewsEst. 2017
Daburji Flyover — Deteriorating a Few Years After Construction
Still Standing (Barely)
Airport-Attari Road, Daburji · Flyover

Daburji Flyover — Deteriorating a Few Years After Construction

The flyover deteriorated to the point former Improvement Trust chairman Dinesh Bassi publicly warned it "may collapse," alleging substandard contractor work and demanding an FIR and high-level inquiry; it was also built without a service lane.

★ 3.6 · 582 reviewsEst. 2025
Subhash Bridge — Span Sinks and Cracks Open Up
Under Repeat Repair
Over the Sabarmati river near Gandhi Ashram, linking Ashram Road/Ellis Bridge area to the Sabarmati Railway Station side · Bridge

Subhash Bridge — Span Sinks and Cracks Open Up

This 1973-built four-lane bridge, carrying thousands of vehicles and several bus routes daily, developed large cracks and a visibly sunken span section in December 2025 — its last repair had been in 2019 — forcing a five-day emergency closure. Months later, in March 2026, Ahmedabad Municipal Corporation approved a ₹240 crore renovation of the bridge.

★ 4.1 · 580 reviewsEst. 1973
Motihari bridge collapse
Collapsed
East Champaran district · Bridge

Motihari bridge collapse

An under-construction bridge collapsed in Motihari — the third such Bihar bridge collapse within a single week.

★ 3.9 · 578 reviewsCollapsed (under construction)
Adas Railway Overbridge Collapse
Collapsed
Level Crossing No. 250, between Vadodara and Adas Road stations, near Adas village · Bridge

Adas Railway Overbridge Collapse

Approach girders of an under-construction railway overbridge near Adas village gave way on May 30, 2026, sustaining substantial structural damage; no injuries since no one was beneath it, but railway authorities launched an inquiry.

★ 4.5 · 560 reviewsEst. 2026
Collapsed
Zathsü paddy field area, over the Tizu river, Meluri district headquarters · Bridge

Meluri Pipeline Suspension Bridge Collapse

A cable suspension truss bridge carrying the sole water-supply pipeline to Meluri district headquarters was washed away by incessant rainfall on September 16, 2025, leaving the entire town without water supply.

★ 3.9 · 550 reviewsEst. 2025
Abandoned
Kulesra village, Dadri–Surajpur–Chhalera Road over the Hindon river · Bridge

Derelict Hindon River Bridge Left Standing 25 Years After Replacement

When Greater Noida Authority built a new four-lane bridge alongside an old two-lane one over the Hindon river roughly 25 years ago, it never demolished the original. That bridge has since developed large pillar cracks and eroded foundation soil, yet pedestrians and cyclists still use it.

★ 4.8 · 547 reviewsEst. 2000
Joka–Esplanade (Purple Line) Metro — Over a Decade of Delay
Under Repeat Repair
Joka to Esplanade/Park Street corridor via Taratala, Majerhat, Mominpur and Khidderpore · Metro station

Joka–Esplanade (Purple Line) Metro — Over a Decade of Delay

The Purple Line was sanctioned in 2010-11 to connect Joka with Esplanade, with RVNL awarded the construction contract in 2011. Only the 6.5km Joka-Taratala stretch actually opened, inaugurated by the Prime Minister in December 2022 — more than a decade after sanction. The remaining extension toward Park Street/Esplanade remained stuck as of 2026, most recently pending a land-swap deal with Nepal's Consulate General needed to build a ramp between the Mominpur and Khidderpore stations.

★ 4.2 · 520 reviewsEst. 2010
Dahisar Skywalk — Shut Since 2016, Still Awaiting Rebuild
Abandoned
Lokmanya Tilak Road, Dahisar West, Mumbai · Skywalk

Dahisar Skywalk — Shut Since 2016, Still Awaiting Rebuild

Built by MMRDA in 2010 and handed to BMC in 2015, a portion of this 850-metre skywalk collapsed in 2016, forcing its complete closure to pedestrians. A structural audit by VJTI initially recommended repairs, but a later consultant's report recommended full reconstruction instead — leaving the structure shut for years while a rebuild languished in tendering.

★ 4.7 · 516 reviewsEst. 2010
Abandoned
Various parts of the city · Public toilet

Locked public toilets

Public toilets built under the Swachh Bharat Mission in parts of Guwahati remain permanently locked, defeating the mission's sanitation goals.

★ 3.9 · 510 reviewsLocked / unused
GIFT City — Gujarat's "Ghost Town" Financial Hub
Still Standing (Barely)
Gujarat International Finance Tec-City (GIFT City), between Ahmedabad and Gandhinagar · Other

GIFT City — Gujarat's "Ghost Town" Financial Hub

Envisioned in 2007 as India's answer to Singapore or Dubai — a self-contained financial city with homes, malls, hospitals and nightlife around its office towers — GIFT City has built out only about 22 million of its planned 62 million square feet. Despite housing over 20,000 workers across 400+ companies, it has just one completed residential project, one five-star hotel, no malls, and Gujarat's statewide alcohol prohibition undercuts the after-work social scene finance professionals expect, leaving many firms' real operations still centred in Mumbai.

★ 4.3 · 505 reviewsEst. 2007
Freedom Park Multi-Level Parking — Half-Finished Inauguration and Years-Long White Elephant
Abandoned
Freedom Park, Seshadri Road, Bengaluru · Parking structure

Freedom Park Multi-Level Parking — Half-Finished Inauguration and Years-Long White Elephant

Designed to hold roughly 580 four-wheelers and 500 two-wheelers, the facility was inaugurated by the Chief Minister while still only partly built — at opening it could handle just 34 cars and 50 two-wheelers. It then sat largely unused for years: BBMP ran at least seven failed tenders to find a private operator, halved the reserve price to attract bidders, floated electric buggies to ferry users to shops as a "last-ditch attempt," and eventually handed it to a firm on terms under which BBMP expects to take about 50 years to recover its investment.

★ 4.5 · 501 reviewsEst. 2018
Ganesapuram Subway — 32-Month Closure
Under Repeat Repair
Ganesapuram, North Chennai (serving Vyasarpadi, Perambur, Pulianthope, Mullai Nagar, Aaduthotti, Jamalia) · Road

Ganesapuram Subway — 32-Month Closure

The Ganesapuram subway, a key link for several North Chennai neighbourhoods, was closed in January 2023 for construction of a road overbridge and stayed shut for roughly 32 months before Greater Chennai Corporation announced its reopening. Residents expressed concern that new pumping arrangements to prevent monsoon flooding were only a short-term fix rather than a permanent storm-water drainage solution.

★ 4.7 · 501 reviewsEst. 2023
Never opened — construction not yet started
Margao Ring Road, between Victor Hospital and La Flor Hotel · Flyover

Victor Hospital–La Flor Hotel Flyover

A year after Central government approval and funding, work on this flyover — meant to ease Margao's chronic ring-road congestion — had not even begun, stuck awaiting a formal No Objection Certificate from South Western Railway since the alignment crosses railway property.

★ 4.8 · 494 reviewsEst. 2023
Ultadanga Flyover — Girder Collapse and Recurring Structural Cracks
Under Repeat Repair
Ultadanga, near the Keshtopur canal / Lake Town, at the VIP Road–EM Bypass junction · Flyover

Ultadanga Flyover — Girder Collapse and Recurring Structural Cracks

Built by Mackintosh Burn Ltd. and inaugurated in January 2011 to link VIP Road/the airport with EM Bypass, a 200-metre iron girder of the flyover collapsed into the Keshtopur canal in March 2013 after a heavily loaded trailer struck the structure, injuring three people. In July 2019, KMDA inspectors found a fresh crack in one of the flyover's piers, forcing a 72-hour traffic shutdown, with officials noting a portion of the same flyover had broken down six years earlier.

★ 3.9 · 490 reviewsEst. 2011
Aishbagh ROB — Bridge With a 90-Degree Turn
Under Repeat Repair
Aishbagh area, near Aishbagh railway station · Bridge

Aishbagh ROB — Bridge With a 90-Degree Turn

The 648-metre, 8.5-metre-wide road-over-bridge was built with an abrupt L-shaped, sharp ~90-degree (later measured at 118-119 degrees) turn, which went viral as "inherently dangerous." After massive public backlash, Indian Railways agreed to transfer extra land so PWD could re-profile the curve for a gentler turn, adding roughly 3 feet of carriageway width; the original construction agency and design consultant were blacklisted.

★ 3.7 · 488 reviewsEst. 2023
Dr Bhimrao Ambedkar Setu (Ambedkar Flyover)
Under Repeat Repair
MP Nagar area (Bhopal's longest flyover, 2.53km) · Flyover

Dr Bhimrao Ambedkar Setu (Ambedkar Flyover)

Bhopal's longest flyover was inaugurated in January 2025; a quality inspection a week later found unsatisfactory riding-surface finishing and excessive expansion-joint corrosion. By August 2026 the asphalt layer had begun peeling with reinforcement rods exposed.

★ 3.5 · 486 reviewsEst. 2025
Kharghar Skywalk
Encroached / misused
Kharghar railway station · Skywalk

Kharghar Skywalk

A section of the pedestrian skywalk connecting Kharghar station to surrounding sectors has been taken over as an illegal parking zone for vehicles, with commuters saying the public infrastructure meant for pedestrians is being completely misused while hawkers already choke the station entrance.

★ 4.7 · 482 reviewsEncroached / misused
Mrinal Tai Gore Flyover — Potholes Hours After Inauguration
Under Repeat Repair
Western Express Highway, connecting Goregaon and Ram Mandir (Jogeshwari), Mumbai · Flyover

Mrinal Tai Gore Flyover — Potholes Hours After Inauguration

This 750-metre flyover extension, originally meant to take 24 months, took roughly 7 years and three cost revisions to complete. Within hours to days of its high-profile inauguration, videos showed visible potholes and patchwork on the freshly laid surface, triggering opposition outrage. BMC had already imposed escalating delay penalties on the contractor (₹25,000/day rising to ₹1 lakh/day) after it missed the revised deadline.

★ 4.5 · 477 reviewsEst. 2026
NTR Bridge (Upputeru Bridge) Partial Collapse
Collapsed
Jagannaickpur, over the Salt Creek/Upputeru waterway · Bridge

NTR Bridge (Upputeru Bridge) Partial Collapse

Roughly 70 metres of the 140-metre, ~30-year-old bridge collapsed, severing a key link in Jagannaickpur. Opposition leaders alleged nearby desilting, dredging and a ₹9 crore park project had undermined the foundation.

★ 4.1 · 476 reviewsEst. 1990
Ahmedabad (Kalupur) Railway Station Redevelopment Cost Overrun
Under Construction
Kalupur Railway Station, central Ahmedabad · Other

Ahmedabad (Kalupur) Railway Station Redevelopment Cost Overrun

The Rail Land Development Authority's flagship redevelopment of Ahmedabad's Kalupur station — styled after the Modhera Sun Temple with bullet-train, metro and bus integration — was budgeted at ₹3,000 crore. When financial bids opened in April 2023, all three bidders quoted far above that: Afcons at ₹5,355 crore, NCC at ₹5,694 crore, and L&T at ₹5,770 crore — a roughly 78% overrun before construction even began.

★ 3.6 · 468 reviewsEst. 2022
Batanagar (Sampriti) Flyover Cracks
Under Repeat Repair
Jinjira Bazaar (Maheshtala) to Batanagar, southern Kolkata suburbs · Flyover

Batanagar (Sampriti) Flyover Cracks

Billed as West Bengal's longest flyover (roughly 7km) and dedicated by Chief Minister Mamata Banerjee in January 2019, the "Sampriti" (Harmony) flyover developed visible cracks on pillars 121 and 122 by January 8, 2020 — barely a year after opening — forcing KMDA to halt all vehicular movement for about 26 hours as a precaution.

★ 4.7 · 466 reviewsEst. 2019
Purvanchal Expressway — Road Caves In 11 Months After Inauguration
Under Repeat Repair
Chand Sarai (Lucknow) to Ghazipur, 341km expressway · Road

Purvanchal Expressway — Road Caves In 11 Months After Inauguration

Less than a year after PM inauguration, the October 2022 monsoon caused wide stretches of the flagship expressway to cave in, with potholes up to 15 feet deep, triggering accidents and vehicle damage across multiple sections.

★ 4.5 · 448 reviewsEst. 2021
Under implementation with major cost overrun
Puri town (Jagannath Temple precinct and beachfront, ABADHA scheme) · Other

Puri "World-Class Heritage City" Cost Overrun

Odisha's flagship ABADHA scheme to redevelop Puri around the Jagannath Temple saw its budget balloon by over ₹1,000 crore due to design changes and additional projects added mid-course.

★ 4.0 · 441 reviewsEst. 2017
Hatkeshwar flyover
Rebuilt
Hatkeshwar, over railway tracks · Flyover

Hatkeshwar flyover

The flyover was declared unfit and closed to traffic soon after opening due to substandard construction quality; four directors of the contractor firm were arrested for cheating and criminal conspiracy.

★ 3.6 · 439 reviewsEst. 2020
Still Standing (Barely)
Rammurthy Pantulu Peta–Kancharapalem · Flyover

Kancharapalem flyover

One of Vizag's oldest flyovers, once beautified ahead of a major international event, has since been left to decay — dead plants, broken tiles and deteriorated vertical-greenery structures — as maintenance funds are reserved mainly for VIP routes.

★ 4.4 · 433 reviewsStill standing (barely) / neglected
Indore BRTS ("iBus" corridor)
Abandoned
AB Road corridor, Indore · Road

Indore BRTS ("iBus" corridor)

Indore's flagship Bus Rapid Transit corridor, once held up nationally as a model project, was ordered dismantled by the Madhya Pradesh High Court after years of complaints that it worsened congestion for other traffic.

★ 3.6 · 430 reviewsEst. 2013
Ralla Wagu Bridge Collapse
Collapsed
Yakkanna Gudem village, Venkatapuram mandal, Mulugu district (near Warangal), on the Cherla-Venkatapuram route · Bridge

Ralla Wagu Bridge Collapse

The bridge had been deteriorating for some time under continuous stress from heavy vehicle traffic, including overloaded sand-mining lorries, before a section gave way on January 4, 2025, cutting the direct Cherla-Venkatapuram passage and forcing a detour via Eturnagaram.

★ 4.7 · 426 reviewsEst. 2025
Under Repeat Repair
Patel Chowk to Choupula Chauraha, Chowki Chauraha, Civil Lines · Other

Smart City Footpaths Smashed by Drain-Cleaning Machinery

Premium footpath tiles installed in 2022 under the Smart City project are being smashed by JCBs and chain machines during routine drain-cleaning instead of careful removal and reuse, destroying crores worth of civic investment.

★ 4.2 · 421 reviewsEst. 2022
Still Standing (Barely)
Sadar, near Samvidhan Square · Flyover

Sadar Flyover

This 3.9km flyover was built with a poorly designed landing that created a chronic traffic bottleneck at Samvidhan Square soon after opening. A state minister publicly acknowledged the "faulty design," and a ₹34-crore modification plan was announced, but implementation has stalled amid inter-agency disputes.

★ 4.1 · 416 reviewsEst. 2020
Perungalathur Flyover — 23-Year Construction Delay
Under Repeat Repair
Srinivasa Nagar, Old Perungalathur, GST Road towards Tambaram/Vandalur · Flyover

Perungalathur Flyover — 23-Year Construction Delay

First sanctioned in 2001, the flyover stayed incomplete for over two decades because an electricity board substation blocking the alignment was never relocated at the planning stage. Phase 3 only opened in June 2023, leaving roughly 200,000 residents to endure prolonged traffic chaos.

★ 4.2 · 413 reviewsEst. 2001
Korattur Railway Station Subway — Years-Long Delay
Under Repeat Repair
Near Korattur railway station, Chennai Central–Arakkonam section · Road

Korattur Railway Station Subway — Years-Long Delay

An 800-metre, 30-foot-wide two-way subway with LED lighting and storm-water drains near Korattur railway station was cleared in 2010 and began construction in 2013, but remained unfinished six years later in 2019 against an expected mid-2020 completion. A local resident noted the Railways had finished their portion of the work, but the Highways Department's portion continued to lag.

★ 4.3 · 402 reviewsEst. 2013
Koyambedu Flyover Cracks and Corrosion
Under Repeat Repair
Koyambedu Junction / Maduravoyal, along the Chennai bypass corridor · Flyover

Koyambedu Flyover Cracks and Corrosion

The 1.15km Koyambedu flyover, inaugurated by CM M K Stalin, developed multiple potholes, exposed expansion joints and jutting-out steel reinforcement bars within about four years — a hazard flagged by cyclists and commuters.

★ 3.4 · 395 reviewsEst. 2021
Lachung Bailey Bridge Collapse
Collapsed
Lachung, over the Lachung Chu river, en route to Katao near the Indo-China border · Bridge

Lachung Bailey Bridge Collapse

A 200-foot, 25-year-old Bailey bridge connecting the two halves of Lachung village and linking it to Katao and Sharchok villages collapsed on January 5, 2025 when an overloaded supply-laden vehicle attempted to cross, severing road connectivity (only a footbridge remained).

★ 3.9 · 387 reviewsEst. 1999
Versova-Bandra Sea Link — Cost Up 140% in 7 Years, Still Barely Started
Under Repeat Repair
17km corridor from Versova to the Bandra-Worli Sea Link, western Mumbai coastline · Bridge

Versova-Bandra Sea Link — Cost Up 140% in 7 Years, Still Barely Started

This MSRDC sea-link project has seen its cost balloon by over 140% in seven years due to technical redesigns (a relocated Juhu exit, a shifted navigation span, and a casting-yard relocation from Juhu to Malad), while its deadline slipped from December 2026 to May 2028. As of the latest disclosure only about 11-12% of construction work had been completed despite years having passed since the contract was awarded.

★ 4.6 · 378 reviewsEst. 2019
Nanganallur Under-Construction Flyover Collapse
Collapsed
Near Nanganallur–Thillai Ganga Nagar tunnel, between Velachery and Pallavaram/Parangi Malai · Flyover

Nanganallur Under-Construction Flyover Collapse

A portion of an under-construction flyover in south Chennai collapsed on January 18, 2024. No casualties were reported, but the incident raised fresh questions about construction quality and supervision on active flyover projects.

★ 3.6 · 366 reviewsEst. 2024
Mohali–Kharar Flyover — Redesigned Twice After Protests
Repeatedly redesigned and delayed
Balongi to Khanpur T-point, Kharar, NH-21 · Flyover

Mohali–Kharar Flyover — Redesigned Twice After Protests

The flyover has been redesigned twice: an original Sector 39–Khanpur alignment was shelved, as was a second alignment, after Phase VI residents and a Gurdwara committee protested planned demolitions; a third mixed elevated/surface design pushed the project years past its 2018 target, with contractor L&T claiming ~₹1 crore/month in losses.

★ 3.9 · 366 reviewsEst. 2016
Under Construction
46km ring road around Berhampur, Chhatrapur, Gopalpur (Ganjam district) · Road

Berhampur Ring Road

Then-CM Naveen Patnaik laid the foundation stone for this ring road in 2013, but land acquisition failures and NHAI non-cooperation meant actual construction of even phase 1 did not begin until November 2021 — eight years later.

★ 3.6 · 364 reviewsEst. 2013
Bhankrota & Kamla Nehru Nagar Flyovers Built With Debris Instead of Soil
Under Repeat Repair
Bhankrota and Kamla Nehru Nagar, Ajmer Road corridor · Flyover

Bhankrota & Kamla Nehru Nagar Flyovers Built With Debris Instead of Soil

Investigation found that instead of filling the space behind retaining walls with proper soil, contractors dumped demolition debris (broken asphalt and concrete chunks from old roads), along with broken blocks and pillars, causing leakage and pillar subsidence risk during monsoon. "Defective cement" was also found used in pillar construction, causing visible damage at multiple points on these two NHAI flyovers meant to serve 75,000-90,000 vehicles a day each.

★ 3.4 · 358 reviewsEst. 2024
Abandoned
Kakinada Port to Rajanagaram via Rangampet and Peddapuram, East Godavari district · Road

Kakinada–Rajanagaram Road Widening (ADB)

A four-laning upgrade of a single-lane, 1997-built ADB-funded road was meant to widen ~30km within three years, but multiple stretches remain incomplete years past deadline, leaving dangerous half-finished sections that cause accidents.

★ 4.6 · 351 reviewsEst. 2018
Sambalpur Central Flyover Cost Blowout
Under Repeat Repair
Central Sambalpur, Dhuturapada Square to Golebazar stretch · Flyover

Sambalpur Central Flyover Cost Blowout

Construction began in February 2016 against local opposition, with a May 2017 deadline; by June 2019 it remained unfinished with costs nearly tripled. Contractor Panda Infratech's work caused four construction accidents, including injury to a schoolgirl, and prolonged traffic chaos devastated local businesses.

★ 4.2 · 350 reviewsEst. 2016
Amaravati Capital City Start-up Area Project
Abandoned
Capital city core, Amaravati (Guntur district) · Other

Amaravati Capital City Start-up Area Project

A flagship public-private capital-city development anchored by a Singapore government-linked consortium was shelved by the incoming state government in November 2019 after the World Bank and AIIB pulled funding, leaving capital-city works stalled for roughly five years before a partial 2024 revival.

★ 4.6 · 347 reviewsEst. 2015
Under Repeat Repair
Elevated road from Sector 30 to Sector 61, bypassing Sectors 23-33 · Road

Noida's ₹500-Crore Elevated Road Left to Rot Amid Contractor Dispute

Noida's 4.8km elevated road suffered surface damage after monsoon rains; the contractor, contractually responsible for upkeep, refused to resurface it citing an unresolved financial dispute with the Noida Authority, forcing the Authority to repair it itself amid an internal probe.

★ 4.4 · 346 reviewsEst. 2017
Delhi BRT (Bus Rapid Transit) corridor
Abandoned
Ambedkar Nagar to Moolchand, Mehrauli-Badarpur Road · Road

Delhi BRT (Bus Rapid Transit) corridor

Delhi's first Bus Rapid Transit corridor was blamed for worsening congestion for private vehicles and was dismantled by the Delhi government in 2016 after years of controversy, PILs, and court battles.

★ 4.4 · 339 reviewsEst. 2008
Pitki Railway Overbridge (NH-18)
Under Construction
Chandil-Ghorangi stretch of NH-18, Pitki railway gate · Flyover

Pitki Railway Overbridge (NH-18)

This 1.4km, 56-pillar overbridge was launched in 2019 with a 2022 target. As of April 2026, only seven of nine planned railway traffic blocks needed over live tracks had been used, leaving ~5,000 vehicles/day and ambulances stuck for up to 5km when level-crossing gates close for over 100 daily trains; cracks have appeared in some pillars.

★ 4.4 · 338 reviewsEst. 2019
Under Repeat Repair
Parwanoo-Solan-Kaithlighat section of NH-5 (Kalka-Shimla highway) · Road

Parwanoo–Solan NH-5 Four-Laning Cost Overrun & Flyover Collapse

The four-laning of a 39km NH-5 stretch, awarded with a 30-month deadline, took over five years to substantially finish and required extensive extra slope-stabilisation after the original design proved inadequate. In August 2022, a large flyover portion on this same stretch collapsed during heavy rain near Solan.

★ 3.6 · 334 reviewsEst. 2015
Under Repeat Repair
Thiruvathukkal–Kallupurakkal–Pathinanjilkadavu Road, border of wards 37/38 · Bridge

Palathara Bridge Structural Failure

A 60-plus-year-old municipal bridge began deteriorating after a heavy truck crossing caused cracking, and a nearby compound wall then collapsed onto it, compromising the foundation. The municipality restricted it to two-wheelers only pending an expert assessment.

★ 4.9 · 328 reviewsEst. 2026
Under scrutiny — project completed but contested
Vallabhipur town, Vallabhipur Branch Canal underground pipeline project · Other

Vallabhipur Branch Canal (SSNNL) Irregularities

Gujarat Congress filed a complaint with the CM and state vigilance commission in August 2026 alleging a ₹400-crore scam in SSNNL's Vallabhipur Branch Canal underground pipeline irrigation project in Bhavnagar district, citing an official CAG audit flagging large-scale irregularities.

★ 4.0 · 326 reviewsEst. 2026
Under Repeat Repair
Pumpwell Junction, NH-66 (Talapady–Kundapur stretch) · Flyover

Pumpwell Flyover

Approved in 2004 and taking roughly a decade to build, the flyover developed visible cracks on its road surface and embankment walls just 3-4 months after its high-profile inauguration, forcing NHAI to seal cracks with tar.

★ 4.2 · 322 reviewsEst. 2020
Abandoned
Locality not specified in source · Park

Neglected public park

A public park built by the city administration lies neglected and overrun with waste, cited by local media as symptomatic of poor upkeep of civic amenities across the city.

★ 4.2 · 319 reviewsAbandoned
Locked/Unusable Public Toilets (Singara Chennai 2.0)
Abandoned
Vepery Fire Station, Mahakavi Bharathi Nagar, Pulianthope Garbage Transfer Station, Ennore Bus Stand, Choolai Postal Station Bus Stand, Purasawalkam and others · Public toilet

Locked/Unusable Public Toilets (Singara Chennai 2.0)

Greater Chennai Corporation spent crores building or upgrading community toilet complexes, but numerous completed units sit permanently locked and never opened, while others suffer inadequate water supply and severe filth that render them unusable.

★ 4.4 · 310 reviewsEst. 2020
Begusarai bridge collapse
Collapsed
Begusarai district · Bridge

Begusarai bridge collapse

A newly built bridge costing ₹13 crore collapsed in Begusarai district, adding to Bihar's string of bridge failures.

★ 4.5 · 302 reviewsCollapsed
Overhead Water Tank Leaking Since Construction
Under Repeat Repair
Masina Khas village, Mithwal block, Pathara area (serving Masina Khas, Bhatpurwa, Shankarpur and Kotiya villages) · Other

Overhead Water Tank Leaking Since Construction

An overhead water tank built to serve roughly 5,000 residents across four villages has leaked since it was completed around 2020; water supply was halted within about six months due to worsening leakage, and even after partial repairs roughly two years later, residents say "leakage in the tank continues," with water accumulating in village lanes.

★ 3.4 · 302 reviewsEst. 2018
Abandoned
Multiple locations across the city · Bridge

Foot Over Bridges (FOBs), citywide

Multiple foot overbridges built across Guwahati sit in a "dismal state," poorly maintained and largely avoided by pedestrians who prefer crossing roads directly at grade.

★ 4.8 · 295 reviewsAbandoned / unused
Collapsed
Near Ratnapur village, Vijayapura–Belagavi (Athani) connecting road · Bridge

Pataragitti Stream Bridge Collapse

A 16-year-old bridge connecting Vijayapura and Belagavi districts over the Pataragitti stream collapsed suddenly on a Monday afternoon, severing the Athani connectivity route and forcing a longer detour via Tikota.

★ 4.3 · 259 reviewsEst. 2002
Still Standing (Barely)
State Highway 57 near Vasudevapuram, Venkatreddy Palle village, near Penukonda (connects to NH-57 and the Anjaneya Swamy Temple area) · Bridge

"Temple Run" Bridge — Triple 90-Degree Turn

This short bridge/road stretch packs three consecutive sharp ~90-degree turns into a brief section, creating a zigzag pattern widely compared online to the mobile game "Temple Run" rather than conventional road design. Google Maps satellite imagery of the structure went viral on social media (shared by Congress Kerala in June 2025), racking up over a million views and a wave of memes questioning why it wasn't built as a simple curve.

★ 4.1 · 249 reviewsStill standing — viral for its bizarre design
STI Overbridge Waterlogging
Still Standing (Barely)
STI Chowk overbridge, Steel City · Flyover

STI Overbridge Waterlogging

Built in 2019, this overbridge developed large craters and broken dividers within two years, turning into knee-deep artificial ponds during rain; on September 16, 2021 Congress activists released live fish onto the flooded bridge to protest the drainage failure.

★ 3.9 · 219 reviewsEst. 2019
Abandoned
Vijayanagar Water Tank, Akkamahadevi Road (Vidyaranyapuram), J.P. Nagar, KRS Main Road near Gokulam, near Lakshmipuram police station, Chamarajapuram · Public toilet

Locked and Unusable Public Toilets

More than ten public toilets built with Swachh Bharat and government grant money have remained locked for years, some with broken windows and drainage problems; a separate 2026 civic survey found toilets missing in 30 wards and closed in nine more.

★ 4.3 · 205 reviewsLocked / unused for years
Padappai Flyover — Multi-Year Delay
Under Repeat Repair
Padappai junction, Vandalur–Walajabad Road (Chennai Metropolitan Area, towards Oragadam/Kancheepuram) · Flyover

Padappai Flyover — Multi-Year Delay

A 700-metre flyover at the Padappai junction, meant to relieve a stretch handling roughly 70,000 vehicles a day, was originally due in about 18 months from its 2019 start but was still only 50% complete as of February 2025 — over five years later. Peak-hour congestion at the site now stretches up to a kilometre, taking commuters roughly 25 minutes to cross, with inadequate lighting cited as a safety hazard.

★ 3.4 · 204 reviewsEst. 2019
Atal Pedestrian Bridge — Glass Floor Cracks
Still Standing (Barely)
Sabarmati Riverfront, connecting the Flower Garden (west bank) to the proposed cultural/arts precinct (east bank) · Bridge

Atal Pedestrian Bridge — Glass Floor Cracks

PM Narendra Modi inaugurated this 300-metre pedestrian bridge over the Sabarmati as a flagship riverfront showpiece featuring a lit glass floor section. About seven months later, in April 2023, one of the toughened-glass panels developed internal cracks — reported as having "shattered internally" — forcing officials to cordon off the spot even as the bridge stayed open to pedestrians.

★ 4.4 · 201 reviewsEst. 2022
Kalighat Skywalk — Four-Year Construction Delay
Completed after ~4-year delay
Kalighat Road, approach to Kalighat Temple, Hazra · Skywalk

Kalighat Skywalk — Four-Year Construction Delay

The Kolkata Municipal Corporation began building a "mega" skywalk to Kalighat Temple in 2021, displacing hawkers from the temple approach road and temporarily relocating around 195 traders to makeshift units at Jatin Das Park. Traders were told they would return to permanent stalls within 18 months, but the project dragged on for four years before keys to the new multi-storey market building were finally handed over on March 27, 2025.

★ 4.7 · 200 reviewsEst. 2021
Durgapur Barrage Bridge Disrepair
Under Repeat Repair
Durgapur Barrage, connecting Durgapur (WB) and Bankura · Bridge

Durgapur Barrage Bridge Disrepair

This bridge, a critical link carrying over 26,000 vehicles daily, went without major renovation for roughly 80 years before the West Bengal government finally ordered urgent repair work ahead of monsoon, citing poor condition.

★ 3.5 · 195 reviewsEst. 1955
Tarkhola–Kalimpong Teesta Bridge Collapse
Collapsed
Tarkhola, Kalimpong district, on the Teesta river bordering Sikkim · Bridge

Tarkhola–Kalimpong Teesta Bridge Collapse

A replacement bridge built to replace one destroyed by the October 2023 glacial lake outburst flood was itself washed away on February 20, 2024, about a week before planned completion, injuring three workers.

★ 3.9 · 189 reviewsEst. 2024
JLN Marg Elevated Road Plan Scrapped Over Aesthetics
Never Built
Jawaharlal Nehru (JLN) Marg, from Ambedkar Circle to Jawahar Circle via JDA Circle · Road

JLN Marg Elevated Road Plan Scrapped Over Aesthetics

An elevated road planned along JLN Marg — already included in the state budget — was shelved after Rajasthan Chief Minister Bhajan Lal Sharma raised aesthetic concerns about the corridor's appearance during a review meeting. The JDA has since pivoted to planning an alternative elevated road along Tonk Road instead, which would require removing the existing older flyovers at Gopalpura and Durgapura crossings.

★ 4.6 · 184 reviewsEst. 2025
Bailey Bridge Collapse Cuts Off 4,000+ Residents
Collapsed
Chamoli district (exact village not specified) · Bridge

Bailey Bridge Collapse Cuts Off 4,000+ Residents

A Bailey bridge in Chamoli district collapsed in June 2024, cutting off road access for more than 4,000 residents, illustrating the fragility of temporary/emergency bridge infrastructure relied upon across Uttarakhand's landslide-prone hill terrain.

★ 3.6 · 149 reviewsEst. 2024
Adampur Flyover — A Decade-Old Project Still Unfinished
Under Repeat Repair
Adampur, on the Jalandhar-Hoshiarpur road · Flyover

Adampur Flyover — A Decade-Old Project Still Unfinished

A flyover sanctioned in 2016 with a two-year completion target remains unfinished more than seven years later despite land acquisition and removal of over 120 encroachments in 2022; residents describe crippled local trade and a 2025 Lok Adalat petition alleging administrative indifference.

★ 4.4 · 142 reviewsEst. 2016
Ved-Variyav bridge
Under Repeat Repair
Ved–Variyav, over the Tapi river · Bridge

Ved-Variyav bridge

The newly inaugurated bridge developed visible cracks just 40 days after opening, part of a pattern of newly built Gujarat flyovers/bridges failing shortly after inauguration.

★ 4.2 · 138 reviewsEst. 2024
Never opened — stalled before construction/design stage
Tawde Hotel to Shivaji Bridge route · Flyover

Tawde Hotel–Shivaji Bridge Flyover

A flyover meant to ease Kolhapur's growing traffic load received in-principle approval but has remained stuck for about two years because the municipal corporation has not appointed a design consultant, with disputes unresolved over who bears service-line relocation costs.

★ 4.8 · 137 reviewsNever opened — stalled before construction/design stage
Lakshman Jhula Shut as "Beyond Repair" — Replacement Still Not Ready Years Later
Still closed / under repair as of 2026
Spanning the Ganga between Tapovan and Jonk, near Lakshman Jhula market · Bridge

Lakshman Jhula Shut as "Beyond Repair" — Replacement Still Not Ready Years Later

The 90-year-old suspension bridge was shut in 2019 after a PWD panel found it "not in a position to sustain any more load." Its ₹56-crore glass-floored replacement, Bajrang Setu, missed its July 2023 deadline and was still under construction (65% done, retargeted June 2025) more than three years after being commissioned; as of May 2026 Lakshman Jhula itself remained closed with no reopening date.

★ 4.2 · 134 reviewsEst. 1927
Under legal dispute; construction proceeded despite unresolved damage allegations
Jagannath Temple precinct · Other

Puri Heritage Corridor Temple Damage

As part of the Heritage Corridor project around the 12th-century Jagannath Temple, excavation by contractor OBCC allegedly destroyed archaeological remains and caused cracks in the Nata Mandap shrine, per a 70-page ASI affidavit in the Orissa High Court; ASI also found the project proceeded without valid National Monuments Authority permission.

★ 3.5 · 117 reviewsEst. 2022
Noida Metro Aqua Line — Missed Deadlines, Thrice-Cancelled Extension Tender
Operational, but extension stalled for years
Noida–Greater Noida Aqua Line corridor (Sector 51 to Depot Station) · Metro station

Noida Metro Aqua Line — Missed Deadlines, Thrice-Cancelled Extension Tender

The Aqua Line, originally slated for May 2017 (then April 2018), did not open until January 2019. Its planned extension then stalled further: tenders were floated and cancelled three times between June 2020 and February 2021 due to poor contractor response.

★ 4.4 · 102 reviewsEst. 2017
AIIMS Darbhanga — Stalled Hospital Project
Severely delayed — only the main gate built years after foundation stone
187-acre campus site, Darbhanga · Other

AIIMS Darbhanga — Stalled Hospital Project

An RTI response revealed that years after being conceptualised in 2015 and despite a PM-led foundation stone ceremony in November 2024, "significant infrastructure work, including the hospital building and academic blocks, has yet to commence" and remains pending further approvals. As of the RTI disclosure, only the main gate had actually been built.

★ 3.5 · 95 reviewsEst. 2015
Ejipura flyover
Under Repeat Repair
Ejipura, near Koramangala · Flyover

Ejipura flyover

A precast concrete slab segment cracked and fell in 2024, injuring an auto-rickshaw driver, repeatedly halting construction pending IISc structural review.

★ 3.6 · 86 reviewsEst. 2022
Sumanahalli Flyover — Recurring Road Collapse
Under Repeat Repair
Sumanahalli Junction, Outer Ring Road (Nayandahalli-Sumanahalli stretch), Bengaluru · Flyover

Sumanahalli Flyover — Recurring Road Collapse

Built by BDA between 2006 and 2010 on the Outer Ring Road with an intended 80-year design lifespan, the Sumanahalli flyover developed a gaping hole exposing the road below in 2019 — less than a decade after opening — and again in later years. A 2020 third-party structural audit commissioned by BBMP found that although 29 inspected city flyovers (including this one) were structurally sound, "none of them was being regularly maintained."

★ 4.2 · 85 reviewsEst. 2006
Lucknow–Kanpur Expressway Cracks Days After Inauguration
Under Repeat Repair
Korari area, Lucknow-Kanpur Greenfield National Elevated Expressway (63km) · Road

Lucknow–Kanpur Expressway Cracks Days After Inauguration

Roughly two weeks after its high-profile inauguration, the expressway's upper asphalt surface caved/cracked over a stretch of about 40 metres; viral photos later showed pedestal fans deployed on the road to dry out rain-soaked patchwork repairs, drawing sharp political criticism.

★ 3.4 · 76 reviewsEst. 2026
Completed after prolonged delay
Shakti Nagar to Gomti Nagar via Khurramnagar, Aliganj, Vikas Nagar, Thakurganj · Flyover

Kukrail (Khurram Nagar) Flyover — 8 Years to Build 5.8km

The 5.8km, six-lane flyover was sanctioned in 2009 but took nearly eight years of construction, plagued by "several construction snags and other issues," before opening in March 2019, three weeks behind even its extended deadline.

★ 4.8 · 73 reviewsEst. 2009
Delisle Bridge (NM Joshi Bridge) — Abrupt Closure and Demolition
Demolished and replaced
Lower Parel, over Western Railway tracks, Mumbai · Bridge

Delisle Bridge (NM Joshi Bridge) — Abrupt Closure and Demolition

This 97-year-old bridge connecting Lower Parel's mill district over railway tracks was abruptly shut to all traffic on July 24, 2018, days after a portion of Andheri's Gokhale Bridge collapsed triggered a citywide review of aging bridges; an IIT-Bombay inspection found its steel girders, pillars and underframe severely corroded and unsafe. It was fully demolished by mid-February 2019 and replaced.

★ 4.2 · 73 reviewsEst. 1918
Gandhi Bazaar Smart City Parking Used as Car Showroom Storage
Diverted from public use
Gandhi Bazaar, Basavanagudi, Bengaluru · Parking structure

Gandhi Bazaar Smart City Parking Used as Car Showroom Storage

A four-storey multi-level parking complex built with ₹27 crore of Smart Cities Mission public funds to ease chronic parking shortages in the busy Gandhi Bazaar commercial district was, soon after opening, allegedly taken over in large part by a Mercedes-Benz dealership to store brand-new luxury vehicles — squeezing out the public parking it was built to provide. Residents said the diversion pushed ordinary motorists back onto roads, footpaths and outside homes and shops in the neighbourhood.

★ 4.9 · 65 reviewsEst. 2020
CSMT "Himalaya Bridge" foot overbridge collapse
Fatal Collapse — 6 dead
Near Chhatrapati Shivaji Maharaj Terminus (CSMT), Fort · Bridge

CSMT "Himalaya Bridge" foot overbridge collapse

A century-old-style foot overbridge near CSMT collapsed during evening rush hour in March 2019, killing 6 people and injuring dozens; the BMC had ignored a prior IIT-Bombay structural safety recommendation.

No rating — fatal incident on recordEst. 2019
Namma Metro (BMRCL) under-construction pillar collapse
Fatal Collapse
Outer Ring Road near HBR Layout, East Bengaluru · Metro station

Namma Metro (BMRCL) under-construction pillar collapse

An under-construction Namma Metro pillar collapsed onto traffic, killing a mother and her 2-year-old son; four BMRCL officials and six others were later charged.

No rating — fatal incident on recordEst. 2023
Signature Bridge
Fatal Collapse
Wazirabad, over the Yamuna river · Bridge

Signature Bridge

Delhi's iconic cable-stayed bridge took 14 years to complete against a 4-year target, marred by fatal construction accidents, cable-stay failures, and contractor disputes, with the budget ballooning several times over.

No rating — fatal incident on recordEst. 2004
Vivekananda Road (Posta) flyover collapse
Fatal Collapse — 27 dead
Girish Park, Rabindra Sarani · Flyover

Vivekananda Road (Posta) flyover collapse

An under-construction flyover collapsed onto a crowded market street during a weekday, killing 27 people and injuring around 80; investigators found defects across design, construction, materials and supervision after 7 years of delays.

No rating — fatal incident on recordEst. 2009
Majerhat bridge collapse
Fatal Collapse — 3 dead
Majerhat, near Alipore, over rail tracks on Diamond Harbour Road · Bridge

Majerhat bridge collapse

A more than 50-year-old bridge collapsed during evening traffic, killing 3 and injuring over 25; it had been flagged unsafe in a 2016 audit but received only "patchwork" bitumen repairs.

No rating — fatal incident on recordEst. 1960
Varanasi flyover collapse
Fatal Collapse — 18 dead
Cantonment area, near Varanasi Junction railway station · Flyover

Varanasi flyover collapse

A girder of an under-construction flyover in the Prime Minister's constituency collapsed onto a busy market road during evening rush hour, crushing vehicles and killing 18 people.

No rating — fatal incident on recordEst. 2015
Morbi suspension bridge collapse
Fatal Collapse — 135 dead
Over the Machchhu river, Morbi town · Bridge

Morbi suspension bridge collapse

A 143-year-old colonial-era suspension bridge, reopened days after a hasty and allegedly substandard renovation, collapsed under crowd weight on Oct 30, 2022, killing 135 people in India's deadliest bridge disaster.

No rating — fatal incident on recordEst. 1880
Gambhira bridge collapse
Fatal Collapse — 22 dead
Over the Mahi river, on the Mujpur–Gambhira road · Bridge

Gambhira bridge collapse

A 40-year-old bridge collapsed suddenly during morning traffic, killing 22 people; initial findings pointed to structural failure from heavy use combined with inadequate maintenance and supervision.

No rating — fatal incident on recordEst. 1985
Bomikhal flyover ("bridge to nowhere")
Fatal Collapse — 2 dead
Bomikhal · Flyover

Bomikhal flyover ("bridge to nowhere")

Meant to be finished within 2 years of its 2012 start, the flyover remained unfinished more than 6 years later after a mid-project design change (from an L-shape to a T-shape) drove massive cost overruns; two people died in separate structural-collapse incidents during construction.

No rating — fatal incident on recordEst. 2012
Indrayani River footbridge collapse
Fatal Collapse — 4 dead
Kundamala/Kundmala picnic spot, Maval tehsil, near Talegaon · Bridge

Indrayani River footbridge collapse

A 32-year-old iron pedestrian bridge over the Indrayani river collapsed on June 15, 2025 under the weight of roughly 100 tourists/picnickers, despite warning boards restricting two-wheeler and overload use. Four people died and 18 were seriously injured; CM Devendra Fadnavis confirmed the district collector had already declared the bridge dangerous before the tragedy and a contract for a replacement bridge had begun.

No rating — fatal incident on recordEst. 1993
Madurai–Natham Highway Flyover Collapse
Fatal Collapse — 1 dead
Between Pandian Hotel Junction and Oomachikulam, Narayanapuram · Flyover

Madurai–Natham Highway Flyover Collapse

On August 28, 2021, a portion of an under-construction flyover on the Madurai-Natham Highway Project collapsed while workers were on site, killing one worker and injuring another.

No rating — fatal incident on recordEst. 2021
Aroor–Thuravoor Elevated Highway Girder Collapse
Fatal Collapse
Eramalloor, Aroor–Thuravoor elevated highway project (NH-66 corridor) · Flyover

Aroor–Thuravoor Elevated Highway Girder Collapse

A steel girder fell onto a pickup van during overnight construction at Eramalloor on November 14, 2025, killing the driver. An NHAI panel found work "carried out in violation of Indian Roads Congress (IRC) safety norms," with serious security lapses by contractor Ashoka Buildcon; the road had stayed open during active girder-lifting. NHAI ordered a wider safety audit of other NH-66 stretches.

No rating — fatal incident on recordEst. 2025
Fatal Collapse
Hosur Cross to Channamma Circle, via Old Court Circle/Lamington Road · Flyover

Hubballi Flyover (Hosur Cross–Channamma Circle)

Sanctioned in 2021, the flyover has missed deadline after deadline — pushed to August 2026 — amid a police-station relocation dispute, a fatal construction accident, buried utility-line discoveries, and land/alignment objections. Authorities have threatened to blacklist the contractor.

No rating — fatal incident on recordEst. 2021
NH-16 Flyover Beam Collapse
Fatal Collapse — 2 dead
National Highway-16, Anakapalle town · Flyover

NH-16 Flyover Beam Collapse

An under-construction flyover beam being erected as part of NH-16 highway-expansion works collapsed directly onto a moving car and truck, killing two people in the car's front seats and injuring two women passengers, one pregnant.

No rating — fatal incident on recordCollapsed (under construction)
Kota Chambal Cable-Stayed Bridge Collapse
Fatal Collapse — 48 dead
Over the Chambal River, near Kota Barrage, NH-76 · Bridge

Kota Chambal Cable-Stayed Bridge Collapse

A partially built span of the under-construction cable-stayed bridge over the Chambal collapsed without warning on December 24, 2009, killing 48 workers and engineers. Construction was halted for years amid contractual dispute before resuming in 2014; the bridge was finally inaugurated by the PM in 2017, roughly eight years after the collapse.

No rating — fatal incident on recordEst. 2000
Fatal Collapse
Misrod to Sant Hirdaram Nagar, 24km corridor · Road

Bhopal BRTS (Bus Rapid Transit) Corridor

The dedicated 24km bus corridor launched in 2013 recorded 121 accidents and 21 fatalities between 2016-2018, worsened congestion in adjoining lanes despite its own underuse, and hurt local businesses; years of pressure eventually led authorities to plan dismantling stretches.

No rating — fatal incident on recordEst. 2013
Fatal Collapse — 1 dead
Near Podi village, Katghora police station area, ~50km from Korba, NH-130 between Katghora and Ambikapur · Bridge

NH-130 Under-Construction Bridge Collapse

A cement slab of an under-construction bridge on NH-130 near Podi village caved in on October 16, 2017, killing one worker and injuring seven, three critically. The bridge was being built by contractor Dilip Buildcon.

No rating — fatal incident on recordEst. 2017
Chhatra Bazar–Malgodown Flyover Collapse
Fatal Collapse — 2 dead
Chhatra Bazar to Malgodown stretch · Flyover

Chhatra Bazar–Malgodown Flyover Collapse

A portion of the flyover connecting Chhatra Bazar and Malgodown partially collapsed on March 9, 2022, killing at least two people (believed vegetable vendors/daily laborers working beneath) and injuring others, with some feared trapped under debris; residents said the structure had been "in a dilapidated condition."

No rating — fatal incident on recordEst. 2022
Bhairabi–Sairang Railway Bridge Collapse
Fatal Collapse — 23 dead
Kurung river, Sairang, Aizawl district · Bridge

Bhairabi–Sairang Railway Bridge Collapse

An under-construction railway bridge over the Kurung river collapsed on August 23, 2023 when a launching gantry gave way, killing at least 23-26 workers (mostly from Malda, West Bengal) in one of India's worst railway construction disasters.

No rating — fatal incident on recordEst. 2023
Gopal Krishna Gokhale Bridge (Gokhale Setu) — Collapse, Demolition & 7-Year Rebuild
Fatal Collapse — 2 dead
Andheri — connects Andheri West (S.V. Road/Ram Mandir side) to Andheri East, over Western Railway tracks near Andheri station · Bridge

Gopal Krishna Gokhale Bridge (Gokhale Setu) — Collapse, Demolition & 7-Year Rebuild

A pedestrian section of this ageing bridge collapsed during monsoon rain on July 3, 2018, killing two people and injuring several others. Post-collapse structural audits eventually led to the entire bridge being shut to traffic in November 2022 and rebuilt. Reconstruction dragged on for years — a 2023 deadline was missed after late girder delivery from an Ambala factory — and even after a much-publicised "reopening" in February 2024, a 6-foot height misalignment between the new bridge and the adjoining C D Barfiwala flyover caused traffic chaos, requiring further realignment work guided by IIT-Bombay and VJTI before the bridge was finally fully operational on May 11, 2025 — nearly 2.5 years after full closure and 7 years after the original collapse.

No rating — fatal incident on recordEst. 1980
Elphinstone Road Foot Overbridge Stampede
Fatal Collapse — 23 dead
Elphinstone Road (now Prabhadevi) railway station foot overbridge, Mumbai · Bridge

Elphinstone Road Foot Overbridge Stampede

During morning rush hour on September 29, 2017, a narrow, decades-old foot overbridge connecting Elphinstone Road and Parel stations became dangerously overcrowded when four trains arrived simultaneously during heavy rain; a panic-inducing rumor that the bridge was collapsing triggered a crush that killed at least 23 people and injured 39. Warnings about the bridge's inadequate capacity had reportedly been raised for years beforehand and ignored.

No rating — fatal incident on recordEst. 2017
Manapakkam Metro Girder Collapse
Fatal Collapse
Mount Poonamallee Road, near L&T head office, Manapakkam · Metro station

Manapakkam Metro Girder Collapse

On the night of June 12, 2025, a 40-foot concrete I-girder under construction for Chennai Metro Phase 2 collapsed from over 20 feet height after its supporting A-frame gave way, crushing a motorist, C. Ramesh (43), to death. It took rescue teams over five hours to retrieve his body from under the girder. Police booked contractor L&T and four of its officials under BNS Section 105 (culpable homicide not amounting to murder).

No rating — fatal incident on recordEst. 2025
Jaipur Bus Rapid Transit System (BRTS) — Abandoned and Dismantled
Fatal Collapse
Sikar Road and New Sanganer Road corridors · Road

Jaipur Bus Rapid Transit System (BRTS) — Abandoned and Dismantled

Jaipur's flagship BRTS, funded substantially by JNNURM, never delivered the 300 buses promised and built only two corridors — Sikar Road, chaotically designed with 11 junctions packed into 8km, and New Sanganer Road, which was "not operational at all." It recorded the lowest ridership of any Indian BRTS city, its median dedicated-lane design proved fatal for pedestrians, and its barricades were eventually ordered dismantled across the city.

No rating — fatal incident on recordEst. 2010
Blunderlust

The civic travel guide to the India we were promised in the brochure. Reviewed without fear, favour, or functioning streetlights.

Destinations

  • Mumbai
  • Bengaluru
  • Ahmedabad
  • All cities

Categories

  • All wonders
  • Flyovers to nowhere
  • Bridges on notice
  • Roads reimagined
  • Skywalks to nowhere
  • Metro in progress
  • Public toilets, theoretically

The Guide

  • Destinations
  • Submit a blunder
  • The Ledger
  • Photo credits
  • Contact desk

“Bureaucracy is a construction by which a person is conveniently separated from the consequences of his or her actions.”

— Nassim Nicholas Taleb, Skin in the Game
NOTICE — Entries document real, publicly reported infrastructure projects, sourced from news reports and RTI replies (see each entry for citations). Star ratings, reviews and editorial tone are satirical framing; the underlying facts are not, and are omitted for entries involving loss of life. Not affiliated with any government body.© 2026 Blunderlust · File No. BL/2026/POTHOLE/01