24 public-works wonders, catalogued in Bengaluru, Karnataka — every entry sourced from news reports, RTI replies and civic archives.

Bengaluru has spent no small sum on attractions of unmatched ambition. Below, newest first, are the public-works entries every visitor should know about before their next trip through the city. Whichever route you take, the guide covers what to see, its current status, and roughly how much it cost the public to build.

Your Bengaluru tour

Open any entry to collect its stamp
Under Repeat Repair#01
Citywide (142 public toilets audited) · Public toilet

Bengaluru Public Toilets

A 2026 citizen-led audit of 142 public toilets across Bengaluru found 26% non-functional, only 6 rated "very clean," and 58% with persistent foul odour, despite the city having roughly just one public toilet for every 30,000 residents. The findings renewed calls for urgent sanitation infrastructure and management reforms.

Blunderlust rating ★ 3.5 · 282 reviewsOn record 2026
Under Repeat Repair#02
Kadabagere, Major Arterial Road (MAR), West Bengaluru · Road

Major Arterial Road, Kadabagere

A newly built ₹500-crore stretch of Bengaluru's Major Arterial Road near Kadabagere developed multiple large sinkholes across a 20-metre stretch just days before its scheduled inauguration on June 27, 2026. A viral video showed gaping craters on the still-uninaugurated road, which remained under contractor control and had not yet been formally handed over to the BDA.

Blunderlust rating ★ 4.1 · 722 reviewsOn record 2026
Under scrutiny / Ongoing financial stress#03
Citywide: Namma Metro Phase 1 & Phase 2 (BMRCL) · Metro station

Namma Metro Land-Cost Overrun

A CAG report tabled in August 2026 found that "improper estimation of land requirements," combined with prolonged delays in land acquisition, inflated Namma Metro's Phase 1 and 2 costs by over ₹6,600 crore. It also found BMRCL posted continuous cash losses from 2013-14 to 2021-22 and remains dependent on state government support to service its debt, with actual ridership falling well short of projections used to justify the heavy-metro design.

Blunderlust rating ★ 3.8 · 168 reviewsOn record 2026
Collapsed#04
NH-44 (Hosur Road), near Attibele, Bengaluru Urban district / Anekal taluk · Road

NH-44 Hosur Road, Attibele

A section of the busy Bengaluru-Hosur stretch of National Highway 44 near Attibele caved in on February 4, 2026, opening a large crater in the carriageway and crippling traffic on one of the city's key routes toward Tamil Nadu. The collapse forced long detours and hours of gridlock on the Bengaluru-Hosur corridor.

Blunderlust rating ★ 4.4 · 655 reviewsOn record 2026
Under Repeat Repair#05
Panathur Railway Under Bridge, connecting Panathur, Balagere, Gunjur and Varthur to Outer Ring Road, East Bengaluru · Road

Panathur Underpass

The Panathur underpass in east Bengaluru flooded yet again after overnight rain in September 2026, despite recent road-widening and upgrade work, because side-drain work was left incomplete and roadside drains remain open, leaving vehicle-movement infrastructure without the drainage needed to function during heavy rain.

Blunderlust rating ★ 3.8 · 963 reviewsOn record 2026
Under Repeat Repair#06
Silk Board Junction, HSR Layout · Flyover

Silk Board–Ragigudda double-decker flyover

Bengaluru's first double-decker flyover was shut for urgent safety fixes just days after it was opened to traffic.

Blunderlust rating ★ 3.7 · 867 reviewsOn record 2026
Under Repeat Repair#07
Silk Board, Vrishabhavathi river, Ambedkar Veedhi, KR Market, KR Circle underpass and other central/south Bengaluru points · Other

Vrishabhavathi Overflow

Heavy rain on May 29, 2026 caused the Vrishabhavathi river to overflow and stormwater drains to fail across more than a dozen central and south Bengaluru locations (including Silk Board, KR Market, the KR Circle underpass and Ambedkar Veedhi near Vidhana Soudha), leaving knee-deep water, snarled traffic and the city grinding to a halt yet again.

Blunderlust rating ★ 3.6 · 1,075 reviewsOn record 2026
Under Repeat Repair#08
Hebbal Junction (Nagavara-K R Puram ramp to Bangalore Baptist Hospital), North Bengaluru · Flyover

Hebbal Flyover Loop

The BDA's Hebbal flyover loop, meant to ease one of Bengaluru's worst traffic bottlenecks, missed its original September 2024 deadline and was only about 65% complete as of January 2025. The agency changed its design mid-project (partially rather than fully dismantling the old Nagavara-K R Puram ramp), adding further confusion, with even a revised Chief-Secretary-mandated April 2025 deadline seen as unlikely to be met.

Blunderlust rating ★ 4.3 · 749 reviewsOn record 2025
Still Standing (Barely)#09
Hosakerehalli, near PES University, South Bengaluru · Flyover

Hosakerehalli Flyover

Meant to take just 15 months, the Hosakerehalli flyover near PES University took roughly five years to open, finally starting operations on November 12, 2025. Commuters say it merely "transferred the bottleneck from ground to flyover" rather than solving it, pointing to an unfinished asphalt layer, closed bus stops, and continued daily congestion at the nearby Janata Bazar junction.

Blunderlust rating ★ 4.0 · 238 reviewsOn record 2025
Under Repeat Repair#10
Kanteerava Studio, connecting Peenya and Nandini Layout, North Bengaluru · Road

Kanteerava Studio Underpass

The BDA resumed construction of the roughly ₹40-crore Kanteerava Studio underpass connecting Peenya and Nandini Layout in December 2025, a full decade after the project first stalled, leaving commuters to navigate a half-built underpass for ten years.

Blunderlust rating ★ 3.6 · 1,356 reviewsOn record 2025
Under Repeat Repair#11
Richmond Town, Central Bengaluru · Road

Richmond Town Potholes

A 43-year-old Richmond Town resident sent BBMP a legal notice in May 2025 demanding ₹50 lakh in compensation after sustaining repeated neck and back injuries from jolts caused by deep potholes and uneven road surfaces on her daily commute, backed by five orthopaedic visits and four emergency-room admissions.

Blunderlust rating ★ 3.7 · 367 reviewsOn record 2025
Under Repeat Repair#12
5th Block, HBR Layout (behind Biodiversity Park, 1st Cross), Bengaluru · Road

White-Topped Road, HBR Layout

A freshly white-topped 200-metre stretch in HBR Layout's 5th Block deteriorated rapidly soon after completion, with residents citing garage and garbage encroachments, mosquito breeding from poor drainage, missing footpaths, and unfinished stormwater drains that raise fears of monsoon flooding.

Blunderlust rating ★ 4.3 · 123 reviewsOn record 2025
Fatal Collapse#13
Outer Ring Road near HBR Layout, East Bengaluru · Metro station

Namma Metro (BMRCL) under-construction pillar collapse

An under-construction Namma Metro pillar collapsed onto traffic, killing a mother and her 2-year-old son; four BMRCL officials and six others were later charged.

No rating — fatal incident on recordOn record 2023
Under Repeat Repair#14
Ejipura, near Koramangala · Flyover

Ejipura flyover

A precast concrete slab segment cracked and fell in 2024, injuring an auto-rickshaw driver, repeatedly halting construction pending IISc structural review.

Blunderlust rating ★ 3.6 · 86 reviewsOn record 2022
Under Repeat Repair#15
Sivananda Circle, towards Race Course Road, Bengaluru · Flyover

Sivananda Circle Flyover

One of the replacement flyovers built after the original Basaveshwara-Hebbal "steel flyover" project was scrapped, this Sivananda Circle flyover was barricaded by BBMP within about a week of its launch after commuters complained of an uneven, undulating road surface. BBMP admitted the surface had problems and ordered a third-party firm to inspect and report on construction quality.

Blunderlust rating ★ 3.5 · 1,327 reviewsOn record 2022
Under Repeat Repair#16
Commercial Street, Shivajinagar, Central Bengaluru · Road

Commercial Street "Smart City" Makeover

Commercial Street was redone under the Smart Cities Mission's TenderSURE guidelines and inaugurated with fanfare in July 2021, but within hours rainwater could not drain and flooded neighbouring shops; within a week the street "wore its usual haggard look." Years later, pavements were still being dug up and the footpaths and carriageway redone.

Blunderlust rating ★ 4.9 · 76 reviewsOn record 2021
Under Repeat Repair#17
Dr Shivakumara Swamiji Flyover, Tumakuru Road, connecting Goraguntepalya to Nelamangala, North Bengaluru · Flyover

Tumakuru Road (Dr Shivakumara Swamiji) Flyover

NHAI abruptly shut this elevated flyover on National Highway 4 for about a week from December 25, 2021 after a routine post-monsoon inspection found rust/erosion damage to two of the 20 steel cables linking pillars 102 and 103. The sudden closure caused major traffic congestion on the highway while an expert committee assessed whether the cables needed replacement.

Blunderlust rating ★ 3.8 · 681 reviewsOn record 2021
Abandoned#18
Freedom Park, Seshadri Road, Bengaluru · Parking structure

Freedom Park Multi-Level Parking

Designed to hold roughly 580 four-wheelers and 500 two-wheelers, the facility was inaugurated by the Chief Minister while still only partly built: at opening it could handle just 34 cars and 50 two-wheelers. It then sat largely unused for years: BBMP ran at least seven failed tenders to find a private operator, halved the reserve price to attract bidders, floated electric buggies to ferry users to shops as a "last-ditch attempt," and eventually handed it to a firm on terms under which BBMP expects to take about 50 years to recover its investment.

Blunderlust rating ★ 4.5 · 501 reviewsOn record 2018
Never Built#19
Proposed route: Basaveshwara Circle to Hebbal / airport road · Flyover

Bengaluru Steel Flyover project

Karnataka government's ambitious 6.7km elevated steel flyover to the airport was cancelled after sustained public protests over tree-felling, cost, and design.

Blunderlust rating ★ 4.7 · 707 reviewsOn record 2017
Under Repeat Repair#20
Bengaluru City (KSR Bengaluru) Railway Station, Platforms 1 and 5 · Railway Station

Bengaluru City Railway Station: Escalators Withdrawn Within Hours of Launch

Four escalators sanctioned in the 2009 Railway Budget at a cost of ₹3 crore were commissioned with fanfare at Bengaluru City railway station, but two of them were pulled out of service within hours after two elderly passengers fell while using them. Only three of the four planned escalators had even been installed at launch, with the fourth delayed to the following month.

Blunderlust rating ★ 4.3 · 136 reviewsOn record 2010
Under Repeat Repair#21
Sumanahalli Junction, Outer Ring Road (Nayandahalli-Sumanahalli stretch), Bengaluru · Flyover

Sumanahalli Flyover

Built by BDA between 2006 and 2010 on the Outer Ring Road with an intended 80-year design lifespan, the Sumanahalli flyover developed a gaping hole exposing the road below in 2019, less than a decade after opening, and again in later years. A 2020 third-party structural audit commissioned by BBMP found that although 29 inspected city flyovers (including this one) were structurally sound, "none of them was being regularly maintained."

Blunderlust rating ★ 4.2 · 85 reviewsOn record 2010
Diverted from public use#22
Gandhi Bazaar, Basavanagudi, Bengaluru · Parking structure

Gandhi Bazaar Smart City Parking Used as Car Showroom Storage

A four-storey multi-level parking complex built with ₹27 crore of Smart Cities Mission public funds to ease chronic parking shortages in the busy Gandhi Bazaar commercial district was, soon after opening, allegedly taken over in large part by a Mercedes-Benz dealership to store brand-new luxury vehicles, squeezing out the public parking it was built to provide. Residents said the diversion pushed ordinary motorists back onto roads, footpaths and outside homes and shops in the neighbourhood.

Blunderlust rating ★ 4.9 · 65 reviewsDiverted from public use
Abandoned#23
Peenya (Sri Basaveshwara Bus Terminal), Bengaluru · Bus Station

Peenya Bus Terminal: KSRTC's ₹37 Crore White Elephant

Built on six acres to divert hundreds of bus services away from the overcrowded Kempegowda Bus Station (Majestic) in central Bengaluru, the Peenya terminal instead caused KSRTC to lose about ₹12 crore within just six months of shifting services there, because its remote location discouraged ridership. KSRTC was forced to reverse course and move the services back to Majestic, leaving the newly built terminal functioning far below its intended capacity.

Blunderlust rating ★ 4.9 · 993 reviewsAbandoned (services reversed back to old terminus)
Under Repeat Repair#24
Tumkur Road, Peenya industrial area · Flyover

Peenya flyover

Heavy vehicles were banned from the flyover for over 3 years after structural defects emerged; a political party alleged corruption behind the substandard construction.

Blunderlust rating ★ 3.8 · 990 reviewsUnder repeat repair

Frequently Asked

Visitor questions

What is the number one place to see in Bengaluru?

Scroll to the list. It runs newest first, by the most recent year on record for each entry, so whatever the city has managed most recently sits at the top. Entries with no documented year are filed at the end.

Are these attractions safe to visit?

Define 'safe'. Daylight visits are advised. Maintain distance from open manholes, leaning structures, and anything under active repair. We accept no liability; neither does anyone else, which is rather the theme.

How much did these projects cost?

Where public figures exist, they're listed on each attraction's page, sourced from tenders, budgets and RTI replies. Several projects have no publicly disclosed final cost — that's noted too.

Can I suggest an attraction for this guide?

Bengaluru produces new landmarks faster than we can rank them. Submit a photo and location via the 'Submit a Blunder' button, and our desk will verify and add it.

Keep Exploring

More cities, more monuments to ambition

Ahmedabad →Mumbai →Hyderabad →Kolkata →
Browse all cities →

Spread the word

Share this one.

Download the Bengaluru card and send it to a friend.

Submit a Blunder →
Blunderlust

The civic travel guide to the India we were promised in the brochure. Reviewed without fear, favour, or functioning streetlights.

Destinations

  • Mumbai
  • Bengaluru
  • Ahmedabad
  • All cities

Categories

  • All wonders
  • Flyovers to nowhere
  • Bridges on notice
  • Roads reimagined
  • Skywalks to nowhere
  • Metro in progress
  • Public toilets, theoretically
  • Airports awaiting flights
  • Stations under redevelopment
  • Bus stands nobody uses

The Guide

  • Destinations
  • Submit a blunder
  • The Ledger
  • Photo credits
  • Contact desk

“Bureaucracy is a construction by which a person is conveniently separated from the consequences of his or her actions.”

— Nassim Nicholas Taleb, Skin in the Game
NOTICE — Entries document real, publicly reported infrastructure projects, sourced from news reports and RTI replies (see each entry for citations). Star ratings, reviews and editorial tone are satirical framing; the underlying facts are not, and are omitted for entries involving loss of life. Not affiliated with any government body, political party, or foreign agency.© 2026 Blunderlust · File No. BL/2026/POTHOLE/01
Spread the word

Join the mission.

This is a public list of failed government projects, kept so they stay on record. Pick either one — both take a minute.

1

Share this with at least one person

Just one is enough. Copy the link and send it to friends & family who would find this useful.

2

Know a failed project near you? Tell us

Know a project that failed or never opened? Fill a short form; we just need a news link as proof.

Submit a blunder →
thank you, genuinely!
Blunderlust