Surfaces that renegotiate their shape with every monsoon. Potholes deep enough to have their own microclimate.

All wondersFlyovers to nowhereBridges on noticeRoads reimaginedSkywalks to nowhereMetro in progressPublic toilets, theoretically
33Attractions catalogued
26Cities represented
4.1 ★Avg. visitor rating
2Documented fatal incidents

Ranked by Notoriety

Browse all 33 entries

Thiruvanmiyur–Uthandi ECR Elevated Corridor Suspension
Never Built
East Coast Road (ECR), between Thiruvanmiyur and Uthandi · Road

Thiruvanmiyur–Uthandi ECR Elevated Corridor Suspension

A planned four-lane elevated corridor along ECR between Thiruvanmiyur and Uthandi, awarded via a Hybrid Annuity Mode concession to KNR Mahabalipuram Infra Private Limited in February 2026, was put on hold pending review by a technical committee after being conspicuously omitted from Tamil Nadu's 2026-27 Highways policy note. A rival bidder had also filed a procurement challenge in the Madras High Court.

★ 3.9 · 1,368 reviewsEst. 2026
Mumbai Coastal Road (Phase 1) — 6-Year Delay and ₹1,243-Crore Cost Overrun
Under Repeat Repair
10.58km stretch from Princess Street Flyover to the Bandra-Worli Sea Link, South Mumbai · Road

Mumbai Coastal Road (Phase 1) — 6-Year Delay and ₹1,243-Crore Cost Overrun

Mumbai's flagship coastal road, meant to be completed in 4 years from contract award, took over 6 years and multiple phased openings before full completion, with costs escalating by over ₹1,243 crore due to BMC-attributed delays including a mid-project change in pillar design. BMC penalised the contractor ₹14 crore for the delays even as it publicized claimed benefits like a "70% reduction in travel time."

★ 4.0 · 1,246 reviewsEst. 2018
Kollam NH-66 Embankment/Service-Road Collapse
Collapsed
Mylakkadu, Adichanallur panchayat, near Kottiyam (Mevaram–Kadampattukonam stretch of NH-66) · Road

Kollam NH-66 Embankment/Service-Road Collapse

On December 5, 2025, a sidewall embankment on an under-construction elevated NH-66 stretch collapsed during soil-filling work, opening craters that trapped vehicles including a school bus (all evacuated safely) — the second such embankment failure on this corridor within six months.

★ 4.8 · 1,213 reviewsEst. 2025
Tonk Road Sinkhole and Citywide Trench Hazards From Gas Pipeline Work
Under Repeat Repair
Tonk Road (near JMC headquarters), plus Sodala Road, Meera Marg (Mansarovar), JLN Marg (Birla Mandir area), Vidhyadhar Nagar, Vaishali Nagar, Jhotwara and Sikar Road · Road

Tonk Road Sinkhole and Citywide Trench Hazards From Gas Pipeline Work

A portion of Tonk Road collapsed into a roughly 20-foot-deep sinkhole in July 2026, one of several similar failures across the city caused by inadequately filled trenches dug for the Torrent Gas pipeline project. Rainfall repeatedly washed away the loose fill material used to close these trenches, exposing dangerous gaps and forcing repeated emergency repairs across multiple neighborhoods.

★ 4.1 · 1,124 reviewsEst. 2026
Under Repeat Repair
1.5km VIP corridor from Aligarh railway station to Aligarh Muslim University · Road

Aligarh's "Smart Road" Falls Apart Within Three Years

Aligarh's flagship Smart City "smart road" began falling apart within three years — streetlights broken or dark at night, and CCTV wiring/camera units near the Police Control Room and Lal Diggi crossing damaged.

★ 3.7 · 1,098 reviewsEst. 2022
Smart City Road Repeatedly Caves In Near Bareilly College
Under Repeat Repair
Near Bareilly College · Road

Smart City Road Repeatedly Caves In Near Bareilly College

A road built under Bareilly's Smart City project caved in near Bareilly College, creating a large pothole — the second collapse recorded at this exact location, exposing weak sewer infrastructure beneath the surface work.

★ 4.5 · 1,031 reviewsEst. 2026
Ludhiana Southern Bypass — 7 Years Late and Over Budget
Completed but 7 years late and over budget
Doraha to Ludhiana-Ferozepur Road, along Sirhind-Sidhwan Canal · Road

Ludhiana Southern Bypass — 7 Years Late and Over Budget

The four-laning of the Ludhiana Southern Bypass was tendered in 2010 with a two-year deadline but wasn't completed until 2019 after officials failed to complete inter-department formalities before the tender was allotted; poor PWD-Irrigation Department coordination drove repeated design changes.

★ 3.5 · 1,012 reviewsEst. 2010
Tellapur Underpass — Chronic Flooding
Under Repeat Repair
Tellapur, Serilingampally Zone, Cyberabad Municipal Corporation limits · Road

Tellapur Underpass — Chronic Flooding

The Tellapur underpass becomes severely waterlogged after every heavy rainfall due to the absence of an effective drainage system with no proper outlet for rainwater, causing traffic standstills lasting hours. Vehicles become stranded and the State Disaster Response Force has had to be deployed to pump water and manage congestion.

★ 4.7 · 910 reviewsEst. 2025
Parimal Underpass — Cracked Walls and Recurring Flooding
Under Repeat Repair
Parimal Underpass, Paldi, near Parimal Garden · Road

Parimal Underpass — Cracked Walls and Recurring Flooding

An August 2024 AMC bridge-audit inspection found cracks in the walls of this heavily used underpass, one of dozens of structures citywide flagged as defective. Weeks later, after about 3.5 inches of rain fell in 24 hours, the underpass flooded and trapped a 25-passenger inter-city bus overnight, requiring rescuers to pull passengers out through the windows using ropes.

★ 4.1 · 895 reviewsEst. 2024
Srinagar Smart City Drainage Failure
Still failing after ₹792 crore spent — external audit ordered
Old City Boulevard Road, Dalgate, Khanyar, Sada Kadal, Nalamar, Rajbagh, Bohri Kadal, Jawahar Nagar, Bemina, Residency Road · Road

Srinagar Smart City Drainage Failure

Despite ₹792 crore spent under the Smart City project, major roads, hospitals and residential areas continue to flood after just hours of rain, most recently in July 2026 when dozens of neighbourhoods were submerged; SMC identified ~60 waterlogging hotspots citywide.

★ 4.6 · 875 reviewsEst. 2017
Abandoned
Panchavati and Bhadrakali (old city areas) · Road

Smart City Area-Based Development roads (57 roads cancelled)

Of 197 roads (43km) planned for modernisation — with footpaths, utility conduits, stormwater lines and smart bus stops — under Nashik's Smart City Area-Based Development plan, 57 roads covering 11km were formally cancelled by the Nashik Municipal Smart City Development Corporation board after facing repeated delays.

★ 3.4 · 873 reviewsEst. 2020
Mirza Ismail (MI) Road 12-Foot Crater After Monsoon Rain
Collapsed
Mirza Ismail (MI) Road, one of Jaipur's busiest commercial thoroughfares · Road

Mirza Ismail (MI) Road 12-Foot Crater After Monsoon Rain

A massive, roughly 12-foot-deep crater suddenly opened up on MI Road, one of the city's busiest streets, after continuous heavy rains, forcing emergency barricading and repair. It was widely shared on video as an example of the poor state of Jaipur's road infrastructure under monsoon stress.

★ 4.8 · 843 reviewsEst. 2025
Collapsed
BCT Road, KM 35.50, Chariduar police station area, near Bhalukpong · Road

BCT Road RCC Culvert Failure

An RCC culvert on the BCT Road failed under continuous heavy rainfall in August 2026, causing road inundation and forcing the District Magistrate to shut the stretch to all but emergency vehicles under the Disaster Management Act.

★ 4.8 · 808 reviewsEst. 2026
Jhansi Road Cave-In
Under Repeat Repair
Jhansi Road, near Jhansi Bus Stand · Road

Jhansi Road Cave-In

A section of Gwalior's busy Jhansi Road — where construction had already dragged on for about 1.5 years without finishing — caved into a 10-foot-deep crater after roughly two hours of heavy rain, trapping a passing car whose occupants escaped unhurt.

★ 4.0 · 790 reviewsEst. 2026
Jaipur Ring Road — A Quarter-Century of Delays and Stalled Control
Under Repeat Repair
Ring road corridor circling Jaipur (Agra Road-Ajmer Road via C-Zone Bypass; Northern Ring Road Chhitroli-Bassi) · Road

Jaipur Ring Road — A Quarter-Century of Delays and Stalled Control

First conceived in 2000, actual construction on Jaipur's Ring Road only began in 2011, and the original contractor's deal was terminated in 2016 for lack of progress; a new contractor finished only a partial 27km stretch by 2019, still missing toll infrastructure, cloverleaves, electricity and traffic signals years later. A newly announced Northern Ring Road (100km, ₹3,000 crore) remains stuck at the land-acquisition stage across 150+ villages as of 2025, with the JDA now formally seeking to strip NHAI of control over the project, citing its slow progress.

★ 3.6 · 789 reviewsEst. 2000
Recurring monsoon waterlogging of underpasses
Under Repeat Repair
City-wide – Hero Honda Chowk, Rajiv Chowk, IFFCO Chowk and other underpasses · Road

Recurring monsoon waterlogging of underpasses

Despite over a decade of drainage and flood-mitigation spending, Gurugram's underpasses and major roads flood every monsoon, submerging vehicles and paralysing traffic citywide.

★ 3.6 · 715 reviewsUnder repeat repair (recurring failure)
NH-66 Kooriyad Embankment and Retaining Wall Collapse
Rebuilt
Kooriyad, National Highway 66 · Road

NH-66 Kooriyad Embankment and Retaining Wall Collapse

A section of NH-66 under construction at Kooriyad collapsed on May 19, 2025 when the foundation soil failed under a high embankment load; the retaining wall collapsed again days later. NHAI suspended its project director, terminated the site engineer, debarred contractor KNR Constructions for up to a year, and fined it ₹20 lakh.

★ 4.4 · 714 reviewsEst. 2025
Hindon Elevated Road — Pillar Erosion & Murky Maintenance Takeover
Still Standing (Barely)
10.3km corridor from UP Gate/NH-9 through Ghaziabad · Road

Hindon Elevated Road — Pillar Erosion & Murky Maintenance Takeover

India's longest six-lane elevated road at the time it opened saw soil erode around pillar No. 187 within months of opening. In 2022 the municipal corporation abruptly took over maintenance and advertising rights without prior board approval, raising concerns about hidden costs.

★ 4.0 · 709 reviewsEst. 2018
Dharamshala Smart City Drainage Failure
Under Repeat Repair
Smart Road (School Board to Bus Stand), Churan, Barol, Sudher, McLeodganj · Road

Dharamshala Smart City Drainage Failure

Despite hundreds of crores spent rebuilding roads/drains under the Smart City Mission, Dharamshala's new covered drainage is too narrow, incorrectly sloped and cable-obstructed, causing uncontrolled rainwater flow every monsoon, replacing older open drains that handled both drainage and irrigation.

★ 4.5 · 678 reviewsEst. 2016
Gaganpahad Underpass — Flooding From a Breached Retaining Wall
Still Standing (Barely)
Gaganpahad · Road

Gaganpahad Underpass — Flooding From a Breached Retaining Wall

The underpass floods with knee-deep water during rains because of a breached retaining wall between a nearby lake and an industrial area, with no proper drainage outlet. Despite multiple resident complaints, only cosmetic civic work (painting) has been done — the structural breach itself remains unrepaired.

★ 3.4 · 660 reviewsEst. 2025
Ganesapuram Subway — 32-Month Closure
Under Repeat Repair
Ganesapuram, North Chennai (serving Vyasarpadi, Perambur, Pulianthope, Mullai Nagar, Aaduthotti, Jamalia) · Road

Ganesapuram Subway — 32-Month Closure

The Ganesapuram subway, a key link for several North Chennai neighbourhoods, was closed in January 2023 for construction of a road overbridge and stayed shut for roughly 32 months before Greater Chennai Corporation announced its reopening. Residents expressed concern that new pumping arrangements to prevent monsoon flooding were only a short-term fix rather than a permanent storm-water drainage solution.

★ 4.7 · 501 reviewsEst. 2023
Purvanchal Expressway — Road Caves In 11 Months After Inauguration
Under Repeat Repair
Chand Sarai (Lucknow) to Ghazipur, 341km expressway · Road

Purvanchal Expressway — Road Caves In 11 Months After Inauguration

Less than a year after PM inauguration, the October 2022 monsoon caused wide stretches of the flagship expressway to cave in, with potholes up to 15 feet deep, triggering accidents and vehicle damage across multiple sections.

★ 4.5 · 448 reviewsEst. 2021
Indore BRTS ("iBus" corridor)
Abandoned
AB Road corridor, Indore · Road

Indore BRTS ("iBus" corridor)

Indore's flagship Bus Rapid Transit corridor, once held up nationally as a model project, was ordered dismantled by the Madhya Pradesh High Court after years of complaints that it worsened congestion for other traffic.

★ 3.6 · 430 reviewsEst. 2013
Korattur Railway Station Subway — Years-Long Delay
Under Repeat Repair
Near Korattur railway station, Chennai Central–Arakkonam section · Road

Korattur Railway Station Subway — Years-Long Delay

An 800-metre, 30-foot-wide two-way subway with LED lighting and storm-water drains near Korattur railway station was cleared in 2010 and began construction in 2013, but remained unfinished six years later in 2019 against an expected mid-2020 completion. A local resident noted the Railways had finished their portion of the work, but the Highways Department's portion continued to lag.

★ 4.3 · 402 reviewsEst. 2013
Under Construction
46km ring road around Berhampur, Chhatrapur, Gopalpur (Ganjam district) · Road

Berhampur Ring Road

Then-CM Naveen Patnaik laid the foundation stone for this ring road in 2013, but land acquisition failures and NHAI non-cooperation meant actual construction of even phase 1 did not begin until November 2021 — eight years later.

★ 3.6 · 364 reviewsEst. 2013
Abandoned
Kakinada Port to Rajanagaram via Rangampet and Peddapuram, East Godavari district · Road

Kakinada–Rajanagaram Road Widening (ADB)

A four-laning upgrade of a single-lane, 1997-built ADB-funded road was meant to widen ~30km within three years, but multiple stretches remain incomplete years past deadline, leaving dangerous half-finished sections that cause accidents.

★ 4.6 · 351 reviewsEst. 2018
Under Repeat Repair
Elevated road from Sector 30 to Sector 61, bypassing Sectors 23-33 · Road

Noida's ₹500-Crore Elevated Road Left to Rot Amid Contractor Dispute

Noida's 4.8km elevated road suffered surface damage after monsoon rains; the contractor, contractually responsible for upkeep, refused to resurface it citing an unresolved financial dispute with the Noida Authority, forcing the Authority to repair it itself amid an internal probe.

★ 4.4 · 346 reviewsEst. 2017
Delhi BRT (Bus Rapid Transit) corridor
Abandoned
Ambedkar Nagar to Moolchand, Mehrauli-Badarpur Road · Road

Delhi BRT (Bus Rapid Transit) corridor

Delhi's first Bus Rapid Transit corridor was blamed for worsening congestion for private vehicles and was dismantled by the Delhi government in 2016 after years of controversy, PILs, and court battles.

★ 4.4 · 339 reviewsEst. 2008
Under Repeat Repair
Parwanoo-Solan-Kaithlighat section of NH-5 (Kalka-Shimla highway) · Road

Parwanoo–Solan NH-5 Four-Laning Cost Overrun & Flyover Collapse

The four-laning of a 39km NH-5 stretch, awarded with a 30-month deadline, took over five years to substantially finish and required extensive extra slope-stabilisation after the original design proved inadequate. In August 2022, a large flyover portion on this same stretch collapsed during heavy rain near Solan.

★ 3.6 · 334 reviewsEst. 2015
JLN Marg Elevated Road Plan Scrapped Over Aesthetics
Never Built
Jawaharlal Nehru (JLN) Marg, from Ambedkar Circle to Jawahar Circle via JDA Circle · Road

JLN Marg Elevated Road Plan Scrapped Over Aesthetics

An elevated road planned along JLN Marg — already included in the state budget — was shelved after Rajasthan Chief Minister Bhajan Lal Sharma raised aesthetic concerns about the corridor's appearance during a review meeting. The JDA has since pivoted to planning an alternative elevated road along Tonk Road instead, which would require removing the existing older flyovers at Gopalpura and Durgapura crossings.

★ 4.6 · 184 reviewsEst. 2025
Lucknow–Kanpur Expressway Cracks Days After Inauguration
Under Repeat Repair
Korari area, Lucknow-Kanpur Greenfield National Elevated Expressway (63km) · Road

Lucknow–Kanpur Expressway Cracks Days After Inauguration

Roughly two weeks after its high-profile inauguration, the expressway's upper asphalt surface caved/cracked over a stretch of about 40 metres; viral photos later showed pedestal fans deployed on the road to dry out rain-soaked patchwork repairs, drawing sharp political criticism.

★ 3.4 · 76 reviewsEst. 2026
Fatal Collapse
Misrod to Sant Hirdaram Nagar, 24km corridor · Road

Bhopal BRTS (Bus Rapid Transit) Corridor

The dedicated 24km bus corridor launched in 2013 recorded 121 accidents and 21 fatalities between 2016-2018, worsened congestion in adjoining lanes despite its own underuse, and hurt local businesses; years of pressure eventually led authorities to plan dismantling stretches.

No rating — fatal incident on recordEst. 2013
Jaipur Bus Rapid Transit System (BRTS) — Abandoned and Dismantled
Fatal Collapse
Sikar Road and New Sanganer Road corridors · Road

Jaipur Bus Rapid Transit System (BRTS) — Abandoned and Dismantled

Jaipur's flagship BRTS, funded substantially by JNNURM, never delivered the 300 buses promised and built only two corridors — Sikar Road, chaotically designed with 11 junctions packed into 8km, and New Sanganer Road, which was "not operational at all." It recorded the lowest ridership of any Indian BRTS city, its median dedicated-lane design proved fatal for pedestrians, and its barricades were eventually ordered dismantled across the city.

No rating — fatal incident on recordEst. 2010
Blunderlust

The civic travel guide to the India we were promised in the brochure. Reviewed without fear, favour, or functioning streetlights.

Destinations

  • Mumbai
  • Bengaluru
  • Ahmedabad
  • All cities

Categories

  • All wonders
  • Flyovers to nowhere
  • Bridges on notice
  • Roads reimagined
  • Skywalks to nowhere
  • Metro in progress
  • Public toilets, theoretically

The Guide

  • Destinations
  • Submit a blunder
  • The Ledger
  • Photo credits
  • Contact desk

“Bureaucracy is a construction by which a person is conveniently separated from the consequences of his or her actions.”

— Nassim Nicholas Taleb, Skin in the Game
NOTICE — Entries document real, publicly reported infrastructure projects, sourced from news reports and RTI replies (see each entry for citations). Star ratings, reviews and editorial tone are satirical framing; the underlying facts are not, and are omitted for entries involving loss of life. Not affiliated with any government body.© 2026 Blunderlust · File No. BL/2026/POTHOLE/01