This 3.9km flyover was built with a poorly designed landing that created a chronic traffic bottleneck at Samvidhan Square soon after opening. A state minister publicly acknowledged the "faulty design," and a ₹34-crore modification plan was announced, but implementation has stalled amid inter-agency disputes.
On record
The official record states: "A state minister acknowledged the flyover's landing had a "faulty design"; the follow-up ₹34-crore fix remains stuck between implementing agencies."
Filed as "Still standing (barely) — design defect unresolved" and dated to Opened early 2020, this entry sits under the "₹219 crore" line of the public accounts.
What to expect
- Pillars reaching skyward with no deck to justify them.
- A signboard promising an opening date that has since passed, unbothered.
- Traffic queuing patiently beneath the unfinished span.
- Rebar exposed where the road was meant to continue.
Sourcing
1 public source — news reports, RTI replies and civic archives — corroborate this entry. The citation trail is listed below for anyone who would like to follow up with the department concerned.
“A project with excellent bones and no follow-through.”— Blunderlust Editorial Desk
Sources
Visitor reviews
“Visited on the anniversary of its first missed deadline, unintentionally. The consultant's report reportedly recommended another consultant.”
“Came here after the beach plan fell through. It is a triumph of allocation over construction.”
“Went with my in-laws, who were surprisingly into it. The barricade paint has faded through two colour schemes.”