Dr Bhimrao Ambedkar Setu (Ambedkar Flyover)
Home / Bhopal / Dr Bhimrao Ambedkar Setu (Ambedkar Flyover)
Under Repeat Repair

Dr Bhimrao Ambedkar Setu (Ambedkar Flyover)

★★★★★ 3.5 / 5 · 486 reviews⌖ MP Nagar area (Bhopal's longest flyover, 2.53km), BhopalEntry #01 in Bhopal
Dr Bhimrao Ambedkar Setu (Ambedkar Flyover) — photo 1
Dr Bhimrao Ambedkar Setu (Ambedkar Flyover) — photo 2

Bhopal's longest flyover was inaugurated in January 2025; a quality inspection a week later found unsatisfactory riding-surface finishing and excessive expansion-joint corrosion. By August 2026 the asphalt layer had begun peeling with reinforcement rods exposed.

On record

The official record states: "PWD's inspection team cited "unsatisfactory riding surface quality and finishing" and "excessive corrosion"; the assistant/sub-engineer were suspended, senior engineers issued show-cause notices, and the contractor fined."

Filed as "Under repeat repair — surface disintegrating within a year" and dated to 2025 (inaugurated Jan 23, 2025), this entry sits under the "₹153-154 crore" line of the public accounts.

What to expect

  • Pillars reaching skyward with no deck to justify them.
  • A signboard promising an opening date that has since passed, unbothered.
  • Traffic queuing patiently beneath the unfinished span.
  • Rebar exposed where the road was meant to continue.

Sourcing

2 public sources — news reports, RTI replies and civic archives — corroborate this entry. The citation trail is listed below for anyone who would like to follow up with the department concerned.

“The corridor exists as an idea with excellent municipal representation.”— Blunderlust Editorial Desk

Sources

  • https://www.amarujala.com/madhya-pradesh/bhopal/flaws-exposed-in-bhopal-s-154-crore-ambedkar-flyover-road-surface-begins-to-disintegrate-within-just-a-year-2026-08-11
  • https://www.tribuneindia.com/news/india/two-engineers-suspended-over-substandard-construction-in-mp

Visitor reviews

“Dragged my partner here on our anniversary, for reasons I stand by. The gap in the middle is apparently permanent now.”
WD W. D'Souza · Bhopal★★★★★
“Arrived just as a maintenance crew was arriving too. You leave with a new respect for the word 'sanctioned'.”
QR Q. Rahman · Bhopal★★★★★
“Walked the full length of it out of sheer stubbornness. It has become a landmark by sheer persistence of failure.”
EB E. Bose · Bhopal★★★★★
Official RecordBL/BHO/2025/FLY
Status
Under repeat repair — surface disintegrating within a year
Category
Flyover
Locality
MP Nagar area (Bhopal's longest flyover, 2.53km)
Year
2025 (inaugurated Jan 23, 2025)
Cost to taxpayers
₹153.5 Cr₹153-154 crore

How to get there

Located in MP Nagar area (Bhopal's longest flyover, 2.53km), Bhopal, Madhya Pradesh. Routes and access change often on entries filed as "Under repeat repair — surface disintegrating within a year" — check current local conditions before visiting.

FlyoverMadhya Pradesh

Nearby Attractions

While you're in the area

Full Bhopal guide →
Fatal Collapse
Misrod to Sant Hirdaram Nagar, 24km corridor · Road

Bhopal BRTS (Bus Rapid Transit) Corridor

The dedicated 24km bus corridor launched in 2013 recorded 121 accidents and 21 fatalities between 2016-2018, worsened congestion in adjoining lanes despite its own underuse, and hurt local businesses; years of pressure eventually led authorities to plan dismantling stretches.

No rating — fatal incident on recordEst. 2013
Smart City Mission Bhopal — "No Visible Development"
Under Repeat Repair
City-wide (multiple area-based development sites) · Other

Smart City Mission Bhopal — "No Visible Development"

Nearly a decade after Bhopal was selected under India's Smart City Mission, residents, local leaders and journalists report little to no visible development on the ground, prompting demands for a high-level probe.

★ 4.6 · 770 reviewsEst. 2016
Aishbagh ROB — Bridge With a 90-Degree Turn
Under Repeat Repair
Aishbagh area, near Aishbagh railway station · Bridge

Aishbagh ROB — Bridge With a 90-Degree Turn

The 648-metre, 8.5-metre-wide road-over-bridge was built with an abrupt L-shaped, sharp ~90-degree (later measured at 118-119 degrees) turn, which went viral as "inherently dangerous." After massive public backlash, Indian Railways agreed to transfer extra land so PWD could re-profile the curve for a gentler turn, adding roughly 3 feet of carriageway width; the original construction agency and design consultant were blacklisted.

★ 3.7 · 488 reviewsEst. 2023
Blunderlust

The civic travel guide to the India we were promised in the brochure. Reviewed without fear, favour, or functioning streetlights.

Destinations

  • Mumbai
  • Bengaluru
  • Ahmedabad
  • All cities

Categories

  • All wonders
  • Flyovers to nowhere
  • Bridges on notice
  • Roads reimagined
  • Skywalks to nowhere
  • Metro in progress
  • Public toilets, theoretically

The Guide

  • Destinations
  • Submit a blunder
  • The Ledger
  • Photo credits
  • Contact desk

“Bureaucracy is a construction by which a person is conveniently separated from the consequences of his or her actions.”

— Nassim Nicholas Taleb, Skin in the Game
NOTICE — Entries document real, publicly reported infrastructure projects, sourced from news reports and RTI replies (see each entry for citations). Star ratings, reviews and editorial tone are satirical framing; the underlying facts are not, and are omitted for entries involving loss of life. Not affiliated with any government body.© 2026 Blunderlust · File No. BL/2026/POTHOLE/01