BlunderlustCivic Travel GuideThis is a work of satire. Mostly.
DestinationsThe LedgerPassportSubmit a Blunder
Home / Mumbai / Gopal Krishna Gokhale Bridge
Fatal Collapse — 2 dead

Gopal Krishna Gokhale Bridge

Fatal incident — no rating on this entry⌖ Andheri: connects Andheri West (S.V. Road/Ram Mandir side) to Andheri East, over Western Railway tracks near Andheri station, MumbaiEntry #03 in Mumbai
Gopal Krishna Gokhale Bridge — photo 1
Gopal Krishna Gokhale Bridge — photo 2

On record

A pedestrian section of this ageing bridge collapsed during monsoon rain on July 3, 2018, killing two people and injuring several others. Post-collapse structural audits eventually led to the entire bridge being shut to traffic in November 2022 and rebuilt. Reconstruction dragged on for years (a 2023 deadline was missed after late girder delivery from an Ambala factory), and even after a much-publicised "reopening" in February 2024, a 6-foot height misalignment between the new bridge and the adjoining C D Barfiwala flyover caused traffic chaos, requiring further realignment work guided by IIT-Bombay and VJTI before the bridge was finally fully operational on May 11, 2025, nearly 2.5 years after full closure and 7 years after the original collapse.

The official record states: "A civic official said: "Though delayed, we set a firm target to open the bridge before the monsoon to avoid further inconvenience. The contractor followed a tight schedule to complete the remaining work.""

No ratings, reviews or visiting tips are published for this entry. It is documented as a matter of public record, not as a tourism recommendation.

“This is not satire. Gopal Krishna Gokhale Bridge is a matter of public record, and at least 2 people did not survive it. We publish it so it is not forgotten between news cycles.”— Blunderlust Editorial Desk

Sources

  • https://www.freepressjournal.in/mumbai/mumbai-news-gokhale-bridge-in-andheri-to-fully-reopen-on-may-11-after-25-year-closure-easing-east-west-traffic-woes
  • https://www.freepressjournal.in/mumbai/mumbai-barfiwala-flyover-gokhale-bridge-height-mismatch-causes-traffic-chaos-for-andheri-commuters
  • https://www.lokmattimes.com/mumbai/mumbai-gokhale-bridge-is-fully-operational-after-7-years-a525/
Blunderlust RecordBL/MUM/1980/BRI
Status
Under repeat repair (finally fully reopened after years of controversy)
Category
Bridge
State
Maharashtra
Year
Built pre-1980s; pedestrian section collapsed July 3, 2018; fully closed Nov 7, 2022; reopened in phases Feb 2024-May 11, 2025
Cost to taxpayers
₹90 CrApprox ₹90 crore (reconstruction); contractor also penalised ₹3 crore for delay
Lives lost
2

Your passport

Unstamped

Stay a moment and this entry goes in your passport.

Mumbai
0 of 10
Nationwide
0
Rank
None yet

1 more for Tourist.

View your passport →

Nearby Attractions

While you're in the area

Full Mumbai guide →
Under Repeat Repair
17km corridor from Versova to the Bandra-Worli Sea Link, western Mumbai coastline · Bridge

Versova-Bandra Sea Link

This MSRDC sea-link project has seen its cost balloon by over 140% in seven years due to technical redesigns (a relocated Juhu exit, a shifted navigation span, and a casting-yard relocation from Juhu to Malad), while its deadline slipped from December 2026 to May 2028. As of the latest disclosure only about 11-12% of construction work had been completed despite years having passed since the contract was awarded.

Blunderlust rating ★ 4.6 · 378 reviewsOn record 2028
Under Repeat Repair
Western Express Highway, connecting Goregaon and Ram Mandir (Jogeshwari), Mumbai · Flyover

Mrinal Tai Gore Flyover

This 750-metre flyover extension, originally meant to take 24 months, took roughly 7 years and three cost revisions to complete. Within hours to days of its high-profile inauguration, videos showed visible potholes and patchwork on the freshly laid surface, triggering opposition outrage. BMC had already imposed escalating delay penalties on the contractor (₹25,000/day rising to ₹1 lakh/day) after it missed the revised deadline.

Blunderlust rating ★ 4.5 · 477 reviewsOn record 2026
Under Repeat Repair
10.58km stretch from Princess Street Flyover to the Bandra-Worli Sea Link, South Mumbai · Road

Mumbai Coastal Road (Phase 1)

Mumbai's flagship coastal road, meant to be completed in 4 years from contract award, took over 6 years and multiple phased openings before full completion, with costs escalating by over ₹1,243 crore due to BMC-attributed delays including a mid-project change in pillar design. BMC penalised the contractor ₹14 crore for the delays even as it publicized claimed benefits like a "70% reduction in travel time."

Blunderlust rating ★ 4.0 · 1,246 reviewsOn record 2024

Spread the word

Share this one.

Download the card for Gopal Krishna Gokhale Bridge and send it to a friend.

Submit a Blunder →
Blunderlust

The civic travel guide to the India we were promised in the brochure. Reviewed without fear, favour, or functioning streetlights.

Destinations

  • Mumbai
  • Bengaluru
  • Ahmedabad
  • All cities

Categories

  • All wonders
  • Flyovers to nowhere
  • Bridges on notice
  • Roads reimagined
  • Skywalks to nowhere
  • Metro in progress
  • Public toilets, theoretically
  • Airports awaiting flights
  • Stations under redevelopment
  • Bus stands nobody uses

The Guide

  • Destinations
  • Submit a blunder
  • The Ledger
  • Photo credits
  • Contact desk

“Bureaucracy is a construction by which a person is conveniently separated from the consequences of his or her actions.”

— Nassim Nicholas Taleb, Skin in the Game
NOTICE — Entries document real, publicly reported infrastructure projects, sourced from news reports and RTI replies (see each entry for citations). Star ratings, reviews and editorial tone are satirical framing; the underlying facts are not, and are omitted for entries involving loss of life. Not affiliated with any government body, political party, or foreign agency.© 2026 Blunderlust · File No. BL/2026/POTHOLE/01
Spread the word

Join the mission.

This is a public list of failed government projects, kept so they stay on record. Pick either one — both take a minute.

1

Share this with at least one person

Just one is enough. Copy the link and send it to friends & family who would find this useful.

2

Know a failed project near you? Tell us

Know a project that failed or never opened? Fill a short form; we just need a news link as proof.

Submit a blunder →
thank you, genuinely!
Blunderlust