The newly inaugurated bridge developed visible cracks just 40 days after opening, part of a pattern of newly built Gujarat flyovers/bridges failing shortly after inauguration.
On record
The official record states: "No detailed official cause statement found in available reporting; authorities ordered inspection and repair."
Filed as "Under repeat repair" and dated to Opened 2024, this entry sits under the "Cost not specified" line of the public accounts.
What to expect
- A structure best photographed from a respectful distance.
- Warning boards whose advice was, at some point, overtaken by events.
- A view of the water that residents did not ask to have this closely.
- Contractor signage, still standing, credit unclear.
Sourcing
1 public source — news reports, RTI replies and civic archives — corroborate this entry. The citation trail is listed below for anyone who would like to follow up with the department concerned.
“A landmark, if a landmark can be defined by the queue of complaints around it.”— Blunderlust Editorial Desk
Sources
Visitor reviews
“Came here as a break from the fort circuit. The inauguration was covered live; the rest, not at all.”
“Visited because my landlord would not stop talking about it. It is the long way round, sanctioned as a shortcut.”
“Went to photograph it before they either finish it or knock it down. There is more signage pointing to it than there is of it.”
