On record
The bridge had been deteriorating for some time under continuous stress from heavy vehicle traffic, including overloaded sand-mining lorries, before a section gave way on January 4, 2025, cutting the direct Cherla-Venkatapuram passage and forcing a detour via Eturnagaram.
The official record states: "Authorities attributed the collapse to prolonged structural deterioration from heavy-vehicle (sand lorry) traffic; the Roads and Buildings department pledged a temporary diversion and repair work "as soon as possible.""
“Worn down by the sand lorries it was never built for, until one day it declined to carry the next one.”— Blunderlust Editorial Desk
Sources
Visitor reviews Satire
“Worn down for years by overloaded sand lorries it was never designed to carry, until it declined the next one.”
“The Cherla to Venkatapuram route now goes via Eturnagaram, which adds a great deal to a short journey.”
“R&B has promised a temporary diversion and repairs as soon as possible, in the same tone as the last promise.”



