Ahmedabad (Kalupur) Railway Station Redevelopment Cost Overrun
Home / Ahmedabad / Ahmedabad (Kalupur) Railway Station Redevelopment Cost Overrun
Under Construction

Ahmedabad (Kalupur) Railway Station Redevelopment Cost Overrun

★★★★★ 3.6 / 5 · 468 reviews⌖ Kalupur Railway Station, central Ahmedabad, AhmedabadEntry #08 in Ahmedabad
Ahmedabad (Kalupur) Railway Station Redevelopment Cost Overrun — photo 1

The Rail Land Development Authority's flagship redevelopment of Ahmedabad's Kalupur station — styled after the Modhera Sun Temple with bullet-train, metro and bus integration — was budgeted at ₹3,000 crore. When financial bids opened in April 2023, all three bidders quoted far above that: Afcons at ₹5,355 crore, NCC at ₹5,694 crore, and L&T at ₹5,770 crore — a roughly 78% overrun before construction even began.

On record

The official record states: "Railway officials said there would be "discussion with the lowest bidder to bring down the price quotation," noting a similar overrun had occurred on the comparable New Delhi station redevelopment tender."

Filed as "Under construction; cost blown past at bidding stage" and dated to Cabinet sanctioned September 2022; bids opened April 2023, this entry sits under the "Estimated at ₹3,000 crore; lowest bid came in at ₹5,355 crore (~78% over estimate)" line of the public accounts.

What to expect

  • A ribbon-cutting photograph that aged faster than the structure.
  • Maintenance records that exist in principle.
  • A budget line that grew with the confidence of the project itself.
  • A file number that outlived several transfer postings.

Sourcing

1 public source — news reports, RTI replies and civic archives — corroborate this entry. The citation trail is listed below for anyone who would like to follow up with the department concerned.

“Completion is always one clearance away, and there is always one more clearance.”— Blunderlust Editorial Desk

Sources

  • https://swarajyamag.com/infrastructure/ahmedabad-station-redevelopment-project-afcons-emerges-lowest-bidder-quoting-rs-5355-crore-against-estimated-cost-of-rs-3000-crore

Visitor reviews

“Visited on a whim and stayed for the disbelief. It really does not disappoint.”
RK R. Kumar · Ahmedabad★★★★★
“Took a visiting relative here instead of the usual sights. The posterity in the photos will thank me.”
SP S. Patel · Ahmedabad★★★★★
“Came for the other and stayed for the commitment to the bit. It is exactly what the file number says it is.”
AF A. Fernandes · Ahmedabad★★★★★
Official RecordBL/AHM/2022/OTH
Status
Under construction; cost blown past at bidding stage
Category
Other
Locality
Kalupur Railway Station, central Ahmedabad
Year
Cabinet sanctioned September 2022; bids opened April 2023
Cost to taxpayers
₹3,000 CrEstimated at ₹3,000 crore; lowest bid came in at ₹5,355 crore (~78% over estimate)

How to get there

Located in Kalupur Railway Station, central Ahmedabad, Ahmedabad, Gujarat. Routes and access change often on entries filed as "Under construction; cost blown past at bidding stage" — check current local conditions before visiting.

OtherGujarat

Nearby Attractions

While you're in the area

Full Ahmedabad guide →
Hatkeshwar flyover
Rebuilt
Hatkeshwar, over railway tracks · Flyover

Hatkeshwar flyover

The flyover was declared unfit and closed to traffic soon after opening due to substandard construction quality; four directors of the contractor firm were arrested for cheating and criminal conspiracy.

★ 3.6 · 439 reviewsEst. 2020
Bopal-Ghuma-Shilaj Railway Overbridge Ends at a Private Plot Wall
Never opened (structure complete but unusable)
Spans the Gora rail yard; north ramp opens onto Bopal-Ghuma road, south ramp terminates near Manipur-Shilaj area · Bridge

Bopal-Ghuma-Shilaj Railway Overbridge Ends at a Private Plot Wall

After six years and ₹65 crore of construction shared between AUDA, DFCCIL and Railways, this railway overbridge connecting Bopal-Ghuma to Shilaj was structurally completed — but its southern ramp simply terminates in a dead end, blocked by a private property's boundary wall, with only a narrow six-metre dirt track leading roughly 2km to the Shilaj main road. Video of the bridge literally running into a wall went viral, becoming a symbol of poor inter-agency planning. As of January 2025 the connecting road on the far side remained unconstructed.

★ 3.7 · 713 reviewsEst. 2018
Atal Pedestrian Bridge — Glass Floor Cracks
Still Standing (Barely)
Sabarmati Riverfront, connecting the Flower Garden (west bank) to the proposed cultural/arts precinct (east bank) · Bridge

Atal Pedestrian Bridge — Glass Floor Cracks

PM Narendra Modi inaugurated this 300-metre pedestrian bridge over the Sabarmati as a flagship riverfront showpiece featuring a lit glass floor section. About seven months later, in April 2023, one of the toughened-glass panels developed internal cracks — reported as having "shattered internally" — forcing officials to cordon off the spot even as the bridge stayed open to pedestrians.

★ 4.4 · 201 reviewsEst. 2022
Blunderlust

The civic travel guide to the India we were promised in the brochure. Reviewed without fear, favour, or functioning streetlights.

Destinations

  • Mumbai
  • Bengaluru
  • Ahmedabad
  • All cities

Categories

  • All wonders
  • Flyovers to nowhere
  • Bridges on notice
  • Roads reimagined
  • Skywalks to nowhere
  • Metro in progress
  • Public toilets, theoretically

The Guide

  • Destinations
  • Submit a blunder
  • The Ledger
  • Photo credits
  • Contact desk

“Bureaucracy is a construction by which a person is conveniently separated from the consequences of his or her actions.”

— Nassim Nicholas Taleb, Skin in the Game
NOTICE — Entries document real, publicly reported infrastructure projects, sourced from news reports and RTI replies (see each entry for citations). Star ratings, reviews and editorial tone are satirical framing; the underlying facts are not, and are omitted for entries involving loss of life. Not affiliated with any government body.© 2026 Blunderlust · File No. BL/2026/POTHOLE/01