On record
Nearly 18 months after construction was finished, this modern bus stand in Jagatsinghpur has never been operationalised because it was never formally handed over to the Odisha State Road Transport Corporation (OSRTC). Electrical fittings and furniture installed inside are deteriorating from disuse, the premises have reportedly become a gathering spot for anti-social elements, and passengers continue to wait for buses roadside with no shelter.
The official record states: "The District Collector said "the process of handing over the bus stand to OSRTC would be completed soon" and promised the facility would become operational shortly."
“Furnished, wired, finished, and never handed over. A bus stand waiting eighteen months for a signature.”— Blunderlust Editorial Desk
Sources
Visitor reviews Satire
“Wired, furnished, finished, and never handed over. Eighteen months of waiting for one signature.”
“The fittings inside are deteriorating with nobody to use them, while passengers wait for buses on the roadside outside.”
“The Collector says the handover to OSRTC will be completed soon, which is what was said a year ago.”
