Kota Chambal Cable-Stayed Bridge Collapse
Fatal Collapse — 48 dead

Kota Chambal Cable-Stayed Bridge Collapse

Fatal incident — no rating on this entryOver the Chambal River, near Kota Barrage, NH-76, KotaEntry #01 in Kota
Kota Chambal Cable-Stayed Bridge Collapse — photo 1

A partially built span of the under-construction cable-stayed bridge over the Chambal collapsed without warning on December 24, 2009, killing 48 workers and engineers. Construction was halted for years amid contractual dispute before resuming in 2014; the bridge was finally inaugurated by the PM in 2017, roughly eight years after the collapse.

On record

The official record states: "RTI findings cited in later reporting attributed the collapse to contractor "inexperience" in cable-stayed bridge construction."

Filed as "Collapsed during construction (2009); took ~8 more years to finish" and dated to Construction began early 2000s; collapsed Dec 24, 2009; completed Aug 29, 2017, this entry sits under the "Not specified" line of the public accounts.

What to expect

  • A structure, project or corridor documented here as a matter of public record.
  • Sources below, for anyone who would like to verify or follow up.
  • No ratings, reviews, or visiting tips — this entry is not a tourism recommendation.

Sourcing

2 public sources — news reports, RTI replies and civic archives — corroborate this entry. The citation trail is listed below for anyone who would like to follow up with the department concerned.

This is not satire. Kota Chambal Cable-Stayed Bridge Collapse is a matter of public record, and at least 48 people did not survive it. We publish it so it is not forgotten between news cycles.— Blunderlust Editorial Desk

Sources