BlunderlustCivic Travel GuideThis is a work of satire. Mostly.
DestinationsThe LedgerSubmit a Blunder
Aguwani Ghat–Sultanganj bridge (Ganga bridge)
Home / Bhagalpur / Aguwani Ghat–Sultanganj bridge (Ganga bridge)
Collapsed

Aguwani Ghat–Sultanganj bridge (Ganga bridge)

★★★★★ 4.3 / 5 · 1,145 reviews⌖ Over the Ganga river, between Sultanganj and Aguwani Ghat, BhagalpurEntry #01 in Bhagalpur
Aguwani Ghat–Sultanganj bridge (Ganga bridge) — photo 1
Aguwani Ghat–Sultanganj bridge (Ganga bridge) — photo 2

A 1.8km under-construction cable-stayed bridge over the Ganga collapsed dramatically in April 2022, then again in June 2023 — a near-unprecedented double collapse during construction, without casualties either time.

On record

The official record states: "No formal government cause report has been published; press speculation cites design and quality-management failures."

Filed as "Collapsed twice; still under reconstruction" and dated to Under construction since 2015; collapsed twice (2022, 2023), this entry sits under the "~₹1,710 crore (~US$208 million) total project cost" line of the public accounts.

What to expect

  • A structure best photographed from a respectful distance.
  • Warning boards whose advice was, at some point, overtaken by events.
  • A view of the water that residents did not ask to have this closely.
  • Contractor signage, still standing, credit unclear.

Sourcing

2 public sources — news reports, RTI replies and civic archives — corroborate this entry. The citation trail is listed below for anyone who would like to follow up with the department concerned.

“The handover is scheduled for a date that keeps its options open.”— Blunderlust Editorial Desk

Sources

  • https://www.etvbharat.com/en/!state/bihar-under-construction-bridge-in-bhagalpur-collapses-enn24081704158
  • https://calleam.com/WTPF/?p=9629

Visitor reviews

“Made a special trip across Bhagalpur just for this. The plaque was on time; the plaque was the whole event.”
BJ B. Joshi · Bhagalpur★★★★★
“Ended up here after the actual attraction was closed. I have seen faster progress in geology.”
HP H. Pillai · Bhagalpur★★★★★
“Saw the crane from the highway and had to investigate. It is ninety percent done and has been for a very long time.”
GC G. Chatterjee · Bhagalpur★★★★★
Official RecordBL/BHA/2015/BRI
Status
Collapsed twice; still under reconstruction
Category
Bridge
Locality
Over the Ganga river, between Sultanganj and Aguwani Ghat
Year
Under construction since 2015; collapsed twice (2022, 2023)
Cost to taxpayers
₹1,710 Cr

How to get there

Located in Over the Ganga river, between Sultanganj and Aguwani Ghat, Bhagalpur, Bihar. Routes and access change often on entries filed as "Collapsed twice; still under reconstruction" — check current local conditions before visiting.

BridgeBihar
Blunderlust

The civic travel guide to the India we were promised in the brochure. Reviewed without fear, favour, or functioning streetlights.

Destinations

  • Mumbai
  • Bengaluru
  • Ahmedabad
  • All cities

Categories

  • All wonders
  • Flyovers to nowhere
  • Bridges on notice
  • Roads reimagined
  • Skywalks to nowhere
  • Metro in progress
  • Public toilets, theoretically

The Guide

  • Destinations
  • Submit a blunder
  • The Ledger
  • Photo credits
  • Contact desk

“Bureaucracy is a construction by which a person is conveniently separated from the consequences of his or her actions.”

— Nassim Nicholas Taleb, Skin in the Game
NOTICE — Entries document real, publicly reported infrastructure projects, sourced from news reports and RTI replies (see each entry for citations). Star ratings, reviews and editorial tone are satirical framing; the underlying facts are not, and are omitted for entries involving loss of life. Not affiliated with any government body.© 2026 Blunderlust · File No. BL/2026/POTHOLE/01