On record
A newly built bridge across the Thenpennai river collapsed on December 3, 2024, during Cyclone Fengal, just three months after opening. The bridge sat at a river bend acknowledged in its own tender document, and nearby bridges survived the same flood undamaged. Anti-corruption group Arappor Iyakkam noted that six months on, no FIR or accountability action had been taken.
The official record states: "Not specified: no formal government cause finding had been made public six months after the collapse."
“The tender document noted the river bend. The bridge did not.”— Blunderlust Editorial Desk
Sources
- https://www.dtnext.in/news/tamilnadu/arappor-seeks-probe-into-tiruvannamalai-bridge-collapse-835948
- https://www.pressreader.com/india/dt-next/20250605/281749865296359
Visitor reviews Satire
“Three months from opening to washed away, and the bridges either side of it came through the same cyclone perfectly fine.”
“The tender itself flagged the river bend. Sixteen crore later, the Thenpennai confirmed the point.”
“Six months on there is no FIR and no cause report, only a gap in a state highway and people taking the long way round.”

