On record
In April 2025, a section of the road surface on the 2012-built Irumbuliyur/Tambaram flyover on GST Road caved in, and a crack was simultaneously found on the flyover's railing wall near its starting point. Just 13 years after construction, the structural deterioration alarmed residents and commuters, prompting police to barricade the area and divert traffic while emergency concrete repairs were carried out.
The official record states: "Tambaram Corporation and Highways officials inspected the spot and began "repair works using concrete," without publicly detailing the root structural cause."
“An ₹88-crore flyover caved in at thirteen, with a cracked railing to match.”— Blunderlust Editorial Desk
Sources
Visitor reviews Satire
“Thirteen years old and the deck caved in at Irumbuliyur, with a crack in the railing wall for company.”
“Eighty-eight crore in 2012, and in 2025 the fix arrived as a barricade and a load of concrete.”
“Police diverted the GST Road traffic while engineers inspected without ever saying what caused it.”



